Download Print this page

Exmark ULTRA VAC Setup Instructions page 16

Lazer z
Hide thumbs Also See for ULTRA VAC:

Advertisement

Figure 23
Assembling the Tubes
1. Slip the upper and the lower tubes together.
2. Insert the upper tube into the hopper seal–push in
then pull out so that the seal is extended outward.
3. Align dimple on upper tube with end of hopper seal
and position vertically between the two screws as
shown in Figure 24 and Figure 25.
Figure 24
52 Inch Unit
1. Dimple
60, 66, and 72 Inch Units
1. Dimple
4. Set the deck in lowest cutting position.
5. Slide lower tube onto blower and latch (make sure
that upper tube does not move out of alignment).
6. Drill 7/32 inch holes in lower tube using upper tube
holes as reference (see Figure 26).
7. Remove the tubes from unit and assemble the upper
(item 2) and the lower tubes (item 3) using three
#10-24 x 3/4 inch hex washer head screws (item 4),
three #10 washers (item 6), and three #10-24 nyloc
nuts (item 5). The screw head should be installed
to the inside of the tube to provide minimum
obstruction to flow. Make sure that the upper and
the lower ends are oriented properly as the tubes are
assembled. (Parting lines should roughly be lined up.)
1. Drill the holes here
8. Slip the upper end of the tube assembly into the
hood opening. Slide the lower end of the tube
assembly over the blower outlet and align the notch
with the tube latch. Latch the tube to the blower.
16
Figure 25
Figure 26

Advertisement

loading