True TCGG-72-S-LD Installation Manual page 9

Curved glass deli case
Table of Contents

Advertisement

TRUE
tcgg
INSTALLING BAKERY CASE SHELVES
A. Lift each door up and out of track (do not disconnect elastic
tubing). Stretch elastic surgical tubing and set doors on each
side of unit.
B.
Remove brackets, lights, shelves, etc. from cabinet interior.
C. Locate shelf supports wrapped in micro foam and install teeth
end into stainless pilasters located on interior walls. Adjust to
desired height matching right and left pairs. See Figures 1 & 2.
D. Locate three horizontal lights wrapped in micro foam and
install (light side down). Electrical cords should be on the right
to plug into side receptacle. Hang end hooks of light assembly
on two shelf supports (left and right) slide assembly forward
until it seats in front notch of shelf support. Then the stainless
steel shelf can be installed on the shelf supports. See figure 3.
WIRE SHELF SUPPORT BRACKETS:
E.
Install rear brackets by sliding end hooks over rear notch of
shelf support. See figure 4.
F.
Locate wire shelves, install top shelf first. With the front lip
(tray stop) up and towards cabinet front, place on top of front
light assembly and snap wire shelf into (2) clips on top of rear
bracket. See figure 5.
G. Plug top light assembly into top receptacle of cabinet interior.
See figure 5.
H. Repeat procedures for remaining two wire shelves. See figure 6.
I.
Replace doors in track.
NOTE: Lights will not operate if they are not plugged in or plug
cover is not plugged in.
1
3
5
.
.
www
truemfg
com
2
4
6
8

Advertisement

Table of Contents
loading

Table of Contents