Attaching The Front-Mount Bottom-Support Rails - Cisco Nexus 7000 Series Hardware Installation And Reference Manual

Hide thumbs Also See for Nexus 7000 Series:
Table of Contents

Advertisement

Attaching the Front-Mount Bottom-Support Rails

Table 2: Center-Mount Kit Contents
Part Description
Center-mount rack mounting brackets
Center-mount bottom-support rails
Crossbar
12-24 x 3/4 in. Phillips screws
M6 x 19 mm Phillips screws
M4 x 8 mm Phillips screws
Attaching the Front-Mount Bottom-Support Rails
To maximize the stability of the rack, you should install the chassis as low as possible on the rack. Install the
heaviest chassis first at the bottom of the rack. If you install a second chassis in the same rack, install it
immediately above the lower chassis if there is enough vertical space.
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions
to ensure that the system remains stable. The following guidelines are provided to ensure your safety:
To attach the front-mount bottom-support rails to a two- or four-post EIA rack, follow these steps:
SUMMARY STEPS
1. Position one of the two front-mount bottom-support rails at the lowest possible RU on the rack. If you
are installing a chassis above another Cisco Nexus 7009 chassis, position the rail 26.25 inches (66.7 cm)
(15 RU) above the bottom-support rails for the lower chassis as shown in
Front-Mount Bottom-Support Rails, on page
2. Use a Phillips screwdriver to screw in two or three (three are recommended if you have three screw holes)
M6 x 19 mm or 12-24 x 3/4 in. Phillips screws on the front end of each bracket (using a total of 6 screws
for both brackets) as shown in .
3. Align the crossbar to the lower back of the two bottom-support rails and use two M4 x 8 mm screws to
attach it to each rail (one screw for each rail).
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
42
• This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
• When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the
heaviest component at the bottom of the rack.
• If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the
unit in the rack. Statement 1006
Quantity
2
2
1
20
20
2
44.
Installing a Cisco Nexus 7009 Chassis
Figure 18: Positioning the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7004Nexus 7009Nexus 7010Nexus 7018

Table of Contents