Toro 147-1660 Manual page 7

Electric deck lift kit
Table of Contents

Advertisement

Available languages

Available languages

5
Installing the New Left
Motion-Control Lever
Parts needed for this procedure:
1
Left motion-control lever
Procedure
1.
Secure the new left motion-control lever using
the previously removed 2 flange-head bolts (3/8
x 1 inch) as shown in
Figure
7.
Figure 7
SUPERCEDED
2.
Route the wire harness on the motion-control
lever through the hole in the left cover plate
(Figure
8).
3.
Secure the wire harness to the notch in the left
motion-control plate
1. Route the harness through
the opening in the left
cover plate here.
g346042
5
(Figure
8).
Figure 8
2. Secure the wire harness
to the notch here.
g346043

Advertisement

Table of Contents
loading

Table of Contents