Battery And Charger Information - Raider PRO RDP-SEBV20 SOLO User Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 15
any damage or injury caused by this, not
the manufacturer.
Please note that the appliance is not intended
for industrial, craft use. We are not responsible
if the appliance is used in industrial, craft
enterprises, as well as in equivalent activities.

3. Battery and charger information

The battery machine is delivered without battery
and charger. Use only the battery and charger
of the R20 System series.
4. Assembly
Assembling the blower tube.
To install the blower tube, slide the nozzle and
push it directly towards the collector outlet until
the locking button returns to its original position
(Fig. 1, Fig. 2, Fig. 3).
Elements of Figure 1:
1. Locking mechanism
2. Blower tube
3. Blow out
To remove the tube, perform the installation
procedure in reverse order.
Assembling the vacuum tube
To assemble the vacuum tube, do the following:
Align the protrusions at the top of the vacuum
tube with the sliding grooves at the bottom of
the suction pipe and then slide it over the lower
part of the tube (Fig. 4).
Elements
1. Lower part of the vacuum tube
2. Upper part of the vacuum tube
Secure the tube with two star bolts by turning
them clockwise.
(Figure 5):
1. Bolt star
To disassemble the pipe, perform the installation
procedure in reverse order.
CAUTION: Always make sure that the pipe is
securely fastened. Otherwise, it may cause
accidental injury
5. Inserting or removing the wheels
To mount the wheels on the tube, do the
following:
Align the protrusions of the tube with the sliding
grooves of the wheels and then slide the wheel
on the tube in the desired position.
See (Fig.6):
1. Wheel; 2. Slider; 3. Protrusion of the suction
pipe 4. Vacuum tube
Place the nut on the mounting hole, press and
hold.
(See Fig.7):
1. Nut;
2. Mounting hole.
Then insert the clamping screw into the
mounting hole on the other side and fasten it by
turning it clockwise (Fig.8 and Fig.9):
1. Tightening screw;
2. Mounting hole.
To remove the wheel, perform the installation
procedure in reverse order. :
CAUTION: Always secure the wheels securely.
Otherwise, they may come off during operation
and cause injury.
6. Installation of the assembled
suction pipe
To install the entire assembled suction pipe on
the collector, do the following:
Pull the slider lock button forward and keep the
protective cover open (Fig.10):
1. Locking mechanism
2. Safety grille
(Fig.11, Fig.12):
1. Piston rod
2. Hook;
3. Assembled suction pipe;
4. Body of the machine
Attach the entire assembled tube by attaching it
directly to the machine body.
Release the guard. Pull the locking mechanism
forward until the tube is fully inserted into the
machine. Then release the button to lock it
again. (Fig.13, Fig.14)
To remove the entire assembled tube, perform
the installation procedure in reverse order.
7. Placing the collection bag
To install the machine bag, slide the bag
opening and then push it directly into the
collector opening until the locking mechanism
returns to its original position.
(Fig.15, Fig.16):
1. Locking mechanism
2. Bag opening
3. Exit
4. Collection bag
Attach the other side of the bag to the opening
of the suction nozzle (Fig. 17):
1. Hook
2. Hole
To remove the bag, perform the installation
procedure in reverse order. Empty the collection
bag in good time. With a high degree of filling,
the suction power obviously decreases.
Take away organic waste for composting.Before
blowing, empty the collection bag. Otherwise
the suction material can be reshaped
departments.
8. On / off
WARNING: Before inserting a battery into the
machine, always make sure that the trigger is
activated correctly and returns to the "OFF"
position when released.
17

Advertisement

Table of Contents
loading

Table of Contents