Download Print this page
Texas Instruments TLIN1021 EVM User Manual

Texas Instruments TLIN1021 EVM User Manual

Evaluation module

Advertisement

Quick Links

This user guide describes the TLIN1021-Q1 evaluation module (EVM). This EVM helps designers
evaluate device performance, support fast development, and analyze automotive local interconnect
network (LIN) systems using TLIN1021-Q1 and TLIN1027-Q1 LIN physical layer transceiver devices.
Trademarks
This user guide describes the TLIN1021-Q1 evaluation module (EVM). This EVM helps designers
evaluate device performance, support fast development, and analyze automotive local interconnect
network (LIN) systems using TLIN1021-Q1 and TLIN1027-Q1 LIN physical layer transceiver devices. are
trademarks of others.
SLLU313 – May 2019
Submit Documentation Feedback
TLIN1021 EVM User's Guide
Figure 1. TLIN1021DEVM Board Image
Copyright © 2019, Texas Instruments Incorporated
User's Guide
SLLU313 – May 2019
TLIN1021 EVM User's Guide
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the TLIN1021 EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TLIN1021 EVM

  • Page 1 (LIN) systems using TLIN1021-Q1 and TLIN1027-Q1 LIN physical layer transceiver devices. are trademarks of others. SLLU313 – May 2019 TLIN1021 EVM User's Guide Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 2 LIN bus connections to allow the EVM to be evaluated in a larger system while still allowing for test equipment to be connected to the signals under test. TLIN1021 EVM User's Guide SLLU313 – May 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 3: Master Mode

    To use the pushbutton Wake circuit, push down on the S2 button while the device is in sleep mode to transition it back to standby mode. SLLU313 – May 2019 TLIN1021 EVM User's Guide Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 4 100V PEC03DAAN 220pF TLIN1021DRQ1 15pF 15pF MMBZ27VCL-7-F 5012 100k VSUP GN D 3.0k WAKE 33.2k EVQP1D05M 100pF Figure 2. Schematic spacer spacer spacer TLIN1021 EVM User's Guide SLLU313 – May 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 5 Socket, IC SK02-0008SOP-QS-11A RS Tech Incorparated Unless otherwise noted in the Alternate PartNumber and/or Alternate Manufacturer columns, all parts may be substituted with equivalents. SLLU313 – May 2019 TLIN1021 EVM User's Guide Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 6 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 7 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 8 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 9 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 10 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 11 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 12: Texas Instruments

    Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments TLIN1021DEVM...