Line distance protection REL650
Version 2.2
Table 54. Underfrequency protection SAPTOF
Function
Operate value, start function, at
symmetrical three phase
1)
voltage, StartFrequency
1)
Reset hysteresis
1)
Operate time
1)
Disengaging time
Operate time delay,
1)
tDelay
Note: The stated accuracy is valid for the voltage range 50 V – 250 V secondary.
1)
The settings and test conditions are in accordance with IEC 60255-181 standard (section 6.2 – 6.7).
74
M14964-1 v13
Start time measurement with sudden
frequency change
fr = 50 Hz
Start time measurement with
frequency ramp
Start time measurement with sudden
frequency change
fr = 60 Hz
Start time measurement with
frequency ramp
Start time measurement with sudden
frequency change
fr = 50 Hz
Start time measurement with
frequency ramp
Start time measurement with sudden
frequency change
fr = 60 Hz
Start time measurement with
frequency ramp
fr = 50 Hz
fr = 60 Hz
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Range or Value
(35.00 - 90.00) Hz
10.0 mHz fixed
Min. = 175 ms
Max. = 195 ms
Min. = 70 ms
Max. = 90 ms
Min. = 150 ms
Max. = 165 ms
Min. = 60 ms
Max. = 75 ms
Min. = 20 ms
Max. = 30 ms
Min. = 75 ms
Max. = 100 ms
Min. = 20 ms
Max. = 30 ms
Min. = 65 ms
Max. = 90 ms
(0.000-60.000)s
1MRK 506 384-BEN H
Accuracy
±2.0 mHz
±2.0 mHz
-
-
-
-
±0.2% or ±200 ms
whichever is greater
±0.2% or ±175 ms
whichever is greater
Hitachi Power Grids