Download Print this page

FASTRON. S-S Series Calibration

Scr power controllers

Advertisement

Quick Links

S-S series SCR Power controllers 0-10V /0-5V input
1. Hardware : changes on PCB board requitred for 4 20mA/0 20mA/POT to Linear Voltage
Change the two chip resistors R38 and R41 in the PCB board to 22K and 6.2K
respectively, connect R38 and R39 (far away from the two ends of the C16 chip
capacitor). As shown below:
(将 PCB 板中 R38 R41 两个贴片电阻分别改为 22K 和 6.2K,再将 R38 和
R39(远离 C16 贴片电容的两端)链接起来。如下图所示 ):
2. Software: 0-10V input signal calibration
.
Set LCK = 169, Press and hold Enter Button for 3 seconds, then set
SET0 = 0000. Press and hold ENT button for 3 seconds
To open input configuration menu please ENT + DOWN KEY together
2.1. Connect the 230V AC power supply to the two terminals AC1 and AC2 on
the PCB board, the signal source (0-10V) is connected to the + /- two terminals of
the PCB board, as shown in the figure below
(将 220V 交流电源接在 PCB 板 AC1,AC2 两个端子上,信号源(0-10V)接在 PCB
板 + - 两个端子上,如下图所示):
signal calibration process
1

Advertisement

loading

Summary of Contents for FASTRON. S-S Series

  • Page 1 S-S series SCR Power controllers 0-10V /0-5V input signal calibration process 1. Hardware : changes on PCB board requitred for 4 20mA/0 20mA/POT to Linear Voltage Change the two chip resistors R38 and R41 in the PCB board to 22K and 6.2K respectively, connect R38 and R39 (far away from the two ends of the C16 chip capacitor).
  • Page 2 2.2 . Press the "ENT key and the down key" at the same time to enter the INP parameter layer and change the INP parameter to 0-10. As shown below (同时按下“ ENT 键和下键” 进入 INP 参数层并将 INP 参数改为 0-10。 如下 图所示) 2.3.
  • Page 3 2.4. After pressing the ENT key to enter the next parameter "ANH", the signal source is given a 10V signal. Press the < button one time, the OUT layer blinking, then press the UP button and Down button one time respectively, and press the ENT button to lock (this action is repeated twice).
  • Page 4 2.6 . End of calibration.到此校验完成 3. Inspection and shielding (检验和屏蔽) 3.1 Inspection: After completing the above one and two steps, then to check signal input correctly. The inspection process as follows : 3.1.1. The signal sources are fed with 0 V /5V /10V signals - The "IN"...
  • Page 5 3.2 Shielding 屏蔽 3.2.1 Press the ENT key and the UP key at the same time to enter the DLY parameter layer, find LOCK and set it to 169, as shown below (同时按 ENT 键和上键进入 DLY 参数层,找到 LOCK 并将其设为 169, 如下图所示): 3.2.2 Press the ENT key for seconds to enter the SET0 layer parameters and set SET0 to 0001.
  • Page 6 3.2.3 Return to the DLY layer key, set the LOCK parameter to 0 , end of shielding . (返回 DLY 层键将 LOCK 参数设为 0 屏蔽结束)