en Installation instructions
Bypass nozzle (mm)
Max. input power (kW)
Min. input power (kW)
Gas flow at 15 °C and 1013 mbar m
Gas flow at 15 °C and 1013 mbar g/h
38
G20/G25
0.76
3
-
3
/h
0.285/0.332
-
G20
G20
G25
0.76
0.67
0.80
3
3
3
-
-
-
0.285
0.285
0.332
-
-
-
G25
G25.3 G30
0.70
0.70
0.48
3
3
3
-
-
-
0.332
0.325
-
-
-
218
G30
0.45
3
-
-
218