Hot Gas Lines
50 (15.2)
Unit
Tonnage
Horizontal &
Vertical Down
2.5
5/8
3
5/8
4
7/8
5
7/8
Liquid Lines
Unit
Tonnage
2.5
3
4
5
Suction Lines
Unit
50 (15.2)
Tonnage
Horizontal &
Vertical Down
6
7/8
8
7/8
10
7/8
13
7/8
Table 2 Hot Gas Lines (Inches OD)
Equivalent Feet (Meters)
100 (30.5)
Vertical
Horizontal &
Vertical Down
Up
5/8
5/8
5/8
5/8
5/8
7/8
7/8
7/8
Table 3 Liquid Lines (Inches OD))
50 (15.2)
100 (30.5)
3/8
1/2
1/2
1/2
Table 4 Suction Lines (Inches OD)
Equivalent Feet (Meters)
100 (30.5)
Vertical
Horizontal &
Vertical Down
Up
7/8
7/8
7/8
7/8
7/8
1-1/8
7/8
1-1/8
NOTICE:
1. If equivalent piping length falls between two columns above, choose
the longer equivalent length.
2. If hot gas line refrigerant flow is upward, use "Vertical Up".
3. If hot gas line refrigerant flow is downward, use "Horizontal & Vertical
Down".
150 (45.7)
Vertical
Horizontal &
Vertical Down
Up
5/8
5/8
5/8
7/8
5/8
7/8
7/8
7/8
Equivalent Feet (Meters)
150 (45.7)
1/2
1/2
1/2
5/8
1/2
5/8
5/8
5/8
150 (45.7)
Vertical
Horizontal &
Vertical Down
Up
7/8
7/8
7/8
7/8
7/8
1-1/8
7/8
1-1/8
21
200 (61.0)
Vertical
Horizontal &
Vertical Down
Up
5/8
7/8
5/8
7/8
5/8
7/8
7/8
7/8
200 (61.0)
1/2
5/8
5/8
5/8
200 (61.0)
Vertical
Horizontal &
Vertical Down
Up
7/8
7/8
7/8
7/8
7/8
1-1/8
7/8
1-1/8
Vertical
Up
5/8
5/8
5/8
7/8
Vertical
Up
7/8
7/8
7/8
7/8