Download Print this page

DAB KVC Instruction For Installation And Maintenance page 11

Advertisement

Fig. 7 KVC - KVCX
drainage cap
9.7 Stopping
Close the interception device on the delivery pipe. If there is a check device on the delivery pipe, the interception
valve on the delivery side may ramain open as long as there is back.
For a long period of inactivity, close the interception device on the intake pipe and, if supplied, all the auxiliary
control connections.
9.8 Precautions
The electropump should not be started an excessive number of times in one hour. The maximum admissible
value is as follows:
When the pump remains inactive for a long time at temperatures of less than 0°C, the pump body must be
completely emptied through the drain cap.
Check that the leakage of liquid does not damage persons or things, especially in plants that
use hot water.
ENGLISH
filling cap
Type of pump
Maximum number of
KVC - KVCX
NKV 10
NKV 15 - NKV 20
NKV 32 - NKV 45
NKV 65 - NKV 95
vent screw
drainage cap
Before filling the pump
you
must
partially
unscrew the drainage
pin/cap!!
starts per hours
30
10
15
÷
5
10
÷
22
Fig. 8 NKV
filling cap
drainage cap

Advertisement

loading

This manual is also suitable for:

KvcxNkv