INSTALLATION AND OPERATION MANUAL
AUTO STACKER
FOUR POST PARKING LIFTS
MODELS:
PL-14000
PL-14000XL
PL-18000
ORIGINAL INSTRUCTIONS IN
ENGLISH LANGUAGE
RECEIVING
The shipment should be thoroughly inspected as soon as it is
received. The signed Bill of Lading is acknowledgement by
the shipping carrier as receipt of this product as listed in your
invoice as being in a good condition of shipment. If any of
these goods listed on this Bill of Lading are missing or dam-
aged, do not accept goods until the shipping carrier makes a
notation on the freight bill of the missing or damaged goods.
Do this for your own protection.
PLEASE READ THE ENTIRE CONTENTS OF THIS MANUAL PRIOR TO INSTALLATION
AND OPERATION. BY PROCEEDING WITH LIFT INSTALLATION AND OPERATION YOU
AGREE THAT YOU FULLY UNDERSTAND AND COMPREHEND THE FULL CONTENTS
OF THIS MANUAL. FORWARD THIS MANUAL TO ALL OPERATORS. FAILURE TO
OPERATE THIS EQUIPMENT AS DIRECTED MAY CAUSE INJURY OR DEATH.
VER C
VER B
VER C
IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
Keep this operation manual near the
machine at all times. Make sure that
BE SAFE
Your new lift was designed and built with safety in mind.
However, your overall safety can be increased with proper
training and thoughtful operation on the part of the operator.
DO NOT operate or repair this equipment without reading this
manual and the important safety instructions shown inside.
Keep this operation manual near the lift at all times. Make sure
that ALL USERS read and understand this manual.
1
ALL USERS read this manual.
1645 Lemonwood Dr.
Santa Paula, CA. 93060, USA
Toll Free 1-800-253-2363
Tel: 1-805-933-9970
Fax: 1-805-933-9160
wwwbendpak.com
MAN REV C 09/12/14
P/N 5900223
Need help?
Do you have a question about the PL-14000 and is the answer not in the manual?
Questions and answers