Instructions For Building In - Progress PBN 1310 User Manual

Hide thumbs Also See for PBN 1310:
Table of Contents

Advertisement

Available languages

Available languages

22 progress

Instructions for building in

To ensure trouble-free operation of the
built-in appliance, the kitchen units or recess
that the appliance is built into must have
suitable dimensions.
According to current regulations all parts
that ensure shock protection from live power
and operation isolating components are
attached in this way so that they cannot be
removed without tools.
These also include the fixing of any end
walls at the beginning or end of a line of
built-in units.
In any case, the accidental contact
protection must be ensured by the building in
of the appliance.
The appliance can be positioned with its
back or side wall against higher kitchen
units, appliances or walls. However, only
other appliances or units of the same height
as the appliance can be placed against the
other side wall.
Oven dimensions
Instructions for building in
To ensure trouble-free operation of the
built-in appliance, the kitchen units or recess
that the appliance is built into must have
suitable dimensions.
Securing in the unit
1 Open the oven door.
2 Secure the oven with the aid of the four
separators in the unit (A). These fit
exactly in the holes in the frame. Then
tighten the four provided wood screws
(B).

Advertisement

Table of Contents
loading

Table of Contents