Installation; Location; Set-Up Sequence - Nibe MT-WH 2029-1FS Manual

Domestic hot water heat pump
Hide thumbs Also See for MT-WH 2029-1FS:
Table of Contents

Advertisement

5 Installation

The domestic hot water heat pump must only be installed by trained personel and in accordance
with the local building codes.

5.1 Location

The NIBE MT-WH 2029-F/1FS must only be installed in a frost-free room. The installation loca-
tion should comply with the following criteria:
• Room temperature between 5°C and +35°C.
• Drain possibility for condensate and floor drain.
• No abnormal dust concentration in the air.
• Solid base (approx. 500 kg / m²)
• It is necessary to ensure that ther is sufficient space around the unit for maintenance and
service. A clearance of 0,5 m around the unit is recommended.

5.2 Set-up sequence

1. Remove the packaging from the pallet.
2. Remove the transport fittings from the pallet.
3. Remove the NIBE MT-WH 2029-F/1FS off the pallet and place it on the floor.
4. Adjust the NIBE MT-WH 2029-F/1FS vertically by adjusting the feet.
1. Screws to be removed (torx).
2. Screws to be removed.
3. Removal of screws.
No holes are to be drilled
in the NIBE MT-WH 2029-F/1FS.
It may damage the condenser
coiled around the water tank.
16

Advertisement

Table of Contents
loading

Table of Contents