Nibe S1155 Installer Manual

Nibe S1155 Installer Manual

Ground source heat pump
Hide thumbs Also See for S1155:

Advertisement

IHB EN 2020-1
531974
Ground source heat pump
NIBE S1155
INSTALLER MANUAL

Advertisement

Table of Contents
loading

Summary of Contents for Nibe S1155

  • Page 1 IHB EN 2020-1 INSTALLER MANUAL 531974 Ground source heat pump NIBE S1155...
  • Page 2 When there is new software to download, you This function page is only visible in installations with a can do it here (provided that S1155 is connected to my- water heater. Uplink).
  • Page 3: Table Of Contents

    General Energy labelling Connections Settings Item register 6 Commissioning and adjusting Contact information Preparations Filling and venting Start-up and inspection Setting the heating curve 7 myUplink Specification Connection Range of services Mobile apps for myUplink NIBE S1155 Table of Contents...
  • Page 4: Important Information

    The serial number can be found at the bottom right on ures for implementation by specialists. S1155, in the display on the home screen "Product overview" and on the type plate (PZ1). The manual must be left with the customer.
  • Page 5: Inspection Of The Installation

    Shut off valves Circulation pump setting Electricity Connections Main voltage Phase voltage Fuses heat pump Fuses property Outside sensor Room sensor Current sensor Safety breaker Earth circuit-breaker Set emergency mode in menu 7.1.8.2 NIBE S1155 Chapter 1 | Important information...
  • Page 6: Delivery And Handling

    Assembly (50) (50) • Place S1155 on a solid foundation indoors that can take the heat pump's weight. Use the product's ad- justable feet to obtain a horizontal and stable set-up. 20-55 mm 30 - 50 mm * A normal installation needs 300 –...
  • Page 7: Supplied Components

    5 x (ø35 x G32) 2 pcs G1 1/4 1 Not Italy and the DACH countries. LOCATION The kit of supplied items is placed in packaging on top of the heat pump. NIBE S1155 Chapter 2 | Delivery and handling...
  • Page 8 Hook the other corner in place. REMOVE SIDE PANEL The side panels can be removed to facilitate the install- ation. Remove the screws from the upper and lower edges. Check the display is straight. Adjust if necessary. Chapter 2 | Delivery and handling NIBE S1155...
  • Page 9 Twist the panel slightly outwards. Move the panel outwards and backwards. Assembly takes place in the reverse order. NIBE S1155 Chapter 2 | Delivery and handling...
  • Page 10: The Heat Pump Design

    3 The heat pump design General S1155-6, -12, -16 S1155-25 AA4-XF3 AA4-XF3 QN10 QN10 QM34 QM31 QM33 QM33 QM31 QM32 QM32 QM34 Chapter 3 | The heat pump design NIBE S1155...
  • Page 11 AA4-XF3 USB port Immersion heater Miniature circuit breaker Choke On/off button Network connection for myUplink S1155-6 3x400 V is not equipped with miniature circuit breakers (FC1). Only for S1155-12 and -25, 3X400 V. MISCELLANEOUS Rating plate Identification plate, cooling module...
  • Page 12: Distribution Boxes

    25 kW 6 kW QA40 BT12 BT12 BT10 BT10 BT11 BT11 1x230 V 12 kW 6 kW 3x230 V 12 kW BT12 BT14 GQ10 QA40 BT17 BT10 XL20 BT11 BT15 XL21 EB10 Chapter 3 | The heat pump design NIBE S1155...
  • Page 13 Inverter BT14 GQ10 Choke EMC-filter QA40 BT17 COOLING COMPONENTS BT15 XL20 Evaporator Condenser GQ10 Compressor EB10 XL21 Drying filter Expansion valve 25 kW GQ10 BT14 BT17 XL21 EB10 BT15 BT29 XL20 NIBE S1155 Chapter 3 | The heat pump design...
  • Page 14: Pipe Connections General

    70 (65 °C with only Non-return valve the compressor). Mixing valve S1155 is not equipped with external shut off valves; Circulation pump these must be installed to facilitate any future servicing. Expansion vessel Caution Filterball Ensure that incoming water is clean.
  • Page 15: Dimensions And Pipe Connections

    Meaning Hot water circulation connections SYSTEM DIAGRAM S1155 consists of heat pump, immersion heater, circu- lation pumps and control system. S1155 is connected to the brine and heating medium circuits. In the heat pump evaporator, the brine (water mixed with anti-freeze, glycol or ethanol) releases its energy to the refrigerant, which is vaporised in order to be compressed in the compressor.
  • Page 16: Brine Side

    Heating medium side CONNECTING THE CLIMATE SYSTEM A climate system is a system that regulates indoor comfort with the help of the control system in S1155 and for example radiators, underfloor heating/cooling, fan convectors etc. • Install all necessary safety devices, shut-off valves (as close to the heat pump as possible) and the enclosed filterball.
  • Page 17: Cold And Hot Water

    • Fit safety valve on heating medium return as illus- FIXED CONDENSING trated. Recommended opening pressure is 0.25 MPa If S1155 is to work towards a water heater with fixed (2.5 bar). For information about max opening pressure, condensing, you must connect external supply temper- see technical specifications.
  • Page 18 If there is a level vessel this should Hot water circulation be replaced. A circulation pump can be controlled by S1155 to circu- late the hot water. The circulating water must have a temperature that prevents bacterial growth and scalding, and national standards must be satisfied.
  • Page 19: Electrical Connections

    • If the building is equipped with an earth-fault breaker, S1155 should be equipped with a separate one. • S1155 must be installed via an isolator switch. The cable area has to be dimensioned based on the fuse rating used.
  • Page 20 Do not start the system before filling up with water. Components in the system could be damaged. MINIATURE CIRCUIT-BREAKER The operating circuit in S1155 and some of its internal components are fused internally by a miniature circuit breaker (FC1). S1155-6 3x400 V is not equipped with miniature circuit breakers (FC1).
  • Page 21: Connections

    If the voltage to the immersion heater and/or com- pressor is lost for a period, this must be blocked at the same time via the selectable inputs, see section "Select- able inputs/outputs – Possible selections for AUX inputs". NIBE S1155 Chapter 5 | Electrical connections...
  • Page 22 A temperature sensor for hot water top (BT7) can be External connections are connected on terminal blocks connected to S1155 to show the water temperature at X28, X29 and X30 on the PCB (AA2). the top of the tank (if it is possible to install a sensor at the top of the tank).
  • Page 23 The multi-core cable between the enclosure and S1155 must have a cable area of at least 0.5 mm². External energy meter Incoming electricity One or two energy meters (BE6, BE7) are connected to AA2-X28:1-2 or AA2-X30:7-8.
  • Page 24 X30:1 (GND), X30:2 (+12V), X30:3 (B) and X30:4 (A) on the PCB (AA2). Use cable type LiYY, EKKX or similar. The example shows the connection of several S1155 . SELECTABLE OUTPUTS/INPUTS Main unit Heat pump 2...
  • Page 25 Potential-free signal of type NO or NC. – Blocking (A: Closed, B: Open) • level (accessory NV10)/, pressure/flow monitor for the “SG Ready” is active. The compressor in S1155 and brine (NC). additional heat are blocked in the same way as External activation of functions today’s tariff blocking.
  • Page 26: Settings

    The electric additional heat may be restricted depending The picture shows the relay in the alarm position. on the selected country. If S1155 is switched off or in emergency mode, the relay The immersion heater's power is split into steps (four is in alarm position.
  • Page 27 3x400 V (maximum electrical power, connected 3x230 V, S1155-6 on delivery 7 kW for S1155-12 / -16 / -25) Max electric- Max phase Max phase Max phase al addition current L1(A) current L2(A) current Max electric- Max phase Max phase...
  • Page 28 When the emergency mode is active, the status lamp turns yellow. To activate when S1155 is running: press and hold the on/off button (SF1) for 2 seconds and select "emergency mode" from the shutdown menu.
  • Page 29: Commissioning And Adjusting Preparations

    Close the reversing valve in the filling connection. NOTE Open the valves on the filler connector. Do not start S1155 if there is a risk that the water in the system has frozen. Start the filling pump. Fill until liquid enters the return pipe.
  • Page 30: Start-Up And Inspection

    To set the correct flow in the brine system, the brine started. The start guide instructions state what needs pump must run at the correct speed. S1155 has a brine to carried out at the first start together with a run pump that is controlled automatically in standard mode.
  • Page 31 To set the correct flow in the heating medium system, (kPa) the heating medium pump must run at the correct P100% speed. S1155 has a heating medium pump that can be automatically controlled in standard mode. Certain functions and accessories may require it to run manually P80% and the correct speed must then be set.
  • Page 32 P80% A high difference indicates a low heating medium supply S1155 25 kW P60% and a low difference indicates a high heating medium Available pressure Output Text text bla bla supply. P40% (kPa) Read off what speed the heating medium pump should P100% have during manual operation from the diagrams below.
  • Page 33: Setting The Heating Curve

    The task of the curve is to give an even indoor temperature, regardless of the outdoor temper- ature, and thereby energy-efficient operation. Based on this curve, the S1155 determines the temperature of the water to the climate system (the supply temperat- Outdoor temperature Utetemperatur ure) and thus the indoor temperature.
  • Page 34 1.30.7. TO READ OFF A HEATING CURVE Drag in the circle on the axis with outdoor temperat- ure. Read off the value for supply temperature in the circle on the other axis. Chapter 6 | Commissioning and adjusting NIBE S1155...
  • Page 35: Myuplink

    You need the following in order for myUplink to be able to communicate with your S1155: Range of services • wireless network or network cable • Internet connection to which S1155 can be connected myUplink gives you access to various levels of service. • account on myuplink.com...
  • Page 36: Control - Introduction

    5 seconds. You can activate the emergency mode both when S1155 is running and when it is switched off. To activate when S1155 is running: press and hold the THE STATUS LAMP on/off button (SF1) for 2 seconds and select "emergency mode"...
  • Page 37: Navigation

    FACTORY SETTING Navigation Factory set values are marked with *. S1155 has a touchscreen where you simply navigate by pressing and dragging with your finger. SELECT Most options and functions are activ- ated by lightly pressing on the display with your finger.
  • Page 38 Set temperature Works to set temperature The drop-down menu shows the current status for S1155, what is in operation and what S1155 is doing at Press the boards to adjust desired value. On certain the moment. function pages, you use your finger to drag up or down to obtain more cards.
  • Page 39 Your system is working properly. Do you want help making changes? Yes please, take me to Smartguide. You can always press "X" to return to the home screens. MAIN MENU Indoor climate Hot water Info My system Connection NIBE S1155 Chapter 8 | Control - Introduction...
  • Page 40: Control - Menus

    The value in the display appears as a temperature in °C, MENU 1.1 TEMPERATURE if the zone is controlled by a room sensor. You make temperature settings for S1155 here. Caution In installations with several climate systems, temperat- ure settings can be made for each system.
  • Page 41 Name room sensor outdoor temperature. It is from this heating curve that S1155 determines the temperature of the water to the Enter a name for the relevant room sensor. climate system, the supply temperature, and therefore Control room sensor the indoor temperature.
  • Page 42 The heating curve is affected at ± 5°C from set outdoor Set the minimum temperature on the supply temperat- temp. point. ure to the climate system. This means that S1155 never calculates a temperature lower than that set here. It is important that the correct heating curve is selected so that the room temperature is experienced as even.
  • Page 43 "-2" and "change in curve" is increased until the desired room temperature is maintained. Caution Wait 24 hours before making a new setting, so that the room temperature has time to sta- bilise. NIBE S1155 Chapter 9 | Control - Menus...
  • Page 44: Menu 2 - Hot Water

    Menu 2 – Hot water OVERVIEW Hot water settings require S1155 to be docked to a water heater. 2.1 - More hot water 2.2 - Hot water demand 2.3 - External impact 2.4 - Periodic increase 2.5 - Hot water circulation Information for the accessories/functions that can affect MENU 2.1 - MORE HOT WATER...
  • Page 45 "Period" Here, you set the time period during which the hot water circulation pump will run, by selecting active days, start time and stop time. NOTE Hot water circulation is activated in menu 7.4 "Selectable in/outputs" or via accessory. NIBE S1155 Chapter 9 | Control - Menus...
  • Page 46: Menu 3 - Info

    Setting range: 1 – 5 years Here, you can see a diagram showing how much energy S1155 supplies and consumes. You can select which parts of the installation will be included in the log. It is also possible to activate display of indoor and/or outdoor temperature.
  • Page 47: Menu 4 - My System

    Alternative: Heating Manual "Compressor" is the unit that produces heating and hot The operating mode for S1155 is normally set to "Auto". water for the home. You cannot deselect "compressor" It is also possible to use operating mode "Additional heat in manual mode.
  • Page 48 Setting range: 0 – 10 compressor operation only (immersion heater not per- mitted). You can select whether you want S1155 to adjust the In the case of overcapacity mode on "SG Ready", the indoor climate based on the weather forecast here.
  • Page 49 Control method tion. Alternative: Price / CO NOTE If Smart Energy Source™ is activated S1155 prioritises This option locks after 24 hours, restart of dis- how / to what extent each docked energy source will play or program updating. be used. Here you can select whether the system will use the energy source that is cheapest at the time or MENU 4.11 - TOOLS...
  • Page 50: Menu 5 - Connection

    Activate "Automatic". The installation now receives the TCP/IP settings using DHCP. Manual setting Select "IP address" and enter correct address using the keyboard. Repeat the procedure for "Network mask", "Gateway" and "DNS". Chapter 9 | Control - Menus NIBE S1155...
  • Page 51: Menu 6 - Scheduling

    Caution A schedule repeats according to the selected setting (e.g. every Monday) until you go into the menu and switch it off. NIBE S1155 Chapter 9 | Control - Menus...
  • Page 52: Menu 7 - Service

    7.9 - Logs 7.9.1 - Change log 7.9.2 - Extended alarm log 7.9.3 - Black box This menu is also shown in the subordinate heat pump’s limited menu system. Consult the accessory’s Installer Manual. Chapter 9 | Control - Menus NIBE S1155...
  • Page 53 Alternative: Auto, intermittent Start temperature Demand mode, small/medium/large Auto: The heating medium pump runs according to the current operating mode for S1155. Setting range: 5 – 70 °C Intermittent: The heating medium pump starts approx. Stop temperature 20 seconds before and stops 20 seconds after the Demand mode, small/medium/large compressor.
  • Page 54 Setting range S1155-12 3x230 V: 0 - 9 kW Setting range: 10 – 30 °C Setting range S1155-6 3x400 V: 0 - 6.5 kW Setting range S1155-12 and -16 3x400 V: 0 - 9 kW Chapter 9 | Control - Menus NIBE S1155...
  • Page 55 4.1 and the current supply temperature exceeds the calculated temperature Select how you want the S1155 to alert you that there by the set value, the additional heat is forced to stop. is an alarm in the display here.
  • Page 56 Set point value cool/heat sensor OPERATING PRIORITY Here you can set at which indoor temperature S1155 is to shift between heating respectively cooling operation. Hot water Heating at room sub temp...
  • Page 57 System settings: Here, you specify whether S1155 is the multi-installation’s main unit. In systems with only Caution one heat pump, S1155 will be the main unit. If there is another main unit in the installation, you enter the ID A higher value for "Start compressor" can give that S1155 will have.
  • Page 58 During active underfloor drying, the heating Hot water charging with subordinate heat medium pump runs at 100 %, regardless of pump in multi-installation. the setting in menu 7.1.2.2. Pool 1 Chapter 9 | Control - Menus NIBE S1155...
  • Page 59 When resetting, the start guide is displayed the next time S1155 restarts. MENU 7.7 - START GUIDE When S1155 is started for the first time, the start guide is automatically activated. From this menu, you can start it manually. NIBE S1155...
  • Page 60: Service

    When the emergency mode is active, the status lamp turns yellow. To activate when S1155 is running: press and hold the on/off button (SF1) for 2 seconds and select "emergency mode" from the shutdown menu.
  • Page 61 To allow air in, unscrew the bleed screw on the highest radiator in the house. Screw in the venting screw (QM5). Start S1155 and check that the circulation pump is When the climate system is empty, the required service working.
  • Page 62 It is often easier to start the circulation pump with S1155 REMOVE THE MOTOR ON THE SHUTTLE running. If the circulation pump is helped to start with VALVE S1155 running, be prepared for the screwdriver to jerk The motor on the shuttle valve can be removed to facil- when the pump starts.
  • Page 63 Disconnect the pipe connection under the shut-off valve (QM31). The cooling module is installed in reverse order. NOTE During reassembly, the enclosed O-rings should replace the existing ones on the shut- off valves (QM32), (QM33) and (QM34). NIBE S1155 Chapter 10 | Service...
  • Page 64 Menu 8.2 - Logging Setting range: 1 s – 60 min Here you can choose how current measurement values from S1155 should be saved onto a log file on the USB memory. Set the desired interval between loggings. Select "Start logging".
  • Page 65 Menu 8.3 - Manage settings Here you can manage (save as or retrieve from) all the menu settings (user and service menus) in S1155 with a USB memory. The menu settings can be saved to the USB memory using "Save settings", in order to restore them later or to copy the settings to another S1155.
  • Page 66: Disturbances In Comfort

    11 Disturbances in comfort In most cases, S1155 notes a malfunction (a malfunction Caution can lead to disruption in comfort) and indicates this with To select "Auxiliary operation", an alarm action alarms, and instructions for action, in the display. must be selected in menu 7.1.8.1 – "Alarm ac- Info-menu tions".
  • Page 67 – If "manual" mode is selected, select "heating". If this is not required for cooling). enough, then also select "additional heat". – S1155 does not call on heating, cooling or hot water. • Too low set value on the automatic heating control. • Compressor blocked due to the temperature condi- –...
  • Page 68 – Go to menu 7.1.2.2 (Pump speed heating medium GP1) and reduce the speed of the circulation pump. • Uneven flow over the radiators. – Adjust the flow distribution between the radiators. Chapter 11 | Disturbances in comfort NIBE S1155...
  • Page 69: Accessories

    S1155. For more information, see the In- DOCKING KIT SOLAR 40 staller Manual for the relevant accessory. Solar 40 means that S1155 (together with VPAS) can be ACCESSORY CARD AXC 40 connected to thermal solar heating. This accessory is used to enable connection and control...
  • Page 70 Valve kit for filling brine in the collector hose. Includes The room unit is an accessory that allows the control and particle filter and insulation. monitoring of S1155 to be carried out in a different part of your home to where it is located. KB 25 (max. 12 kW) KB 32 (max.
  • Page 71 VPB S300 Copper Part no. 081 139 Copper Part no. 081 142 Enamel Part no. 081 140 Enamel Part no. 081 144 Stainless Part no. 081 141 Stainless Part no. 081 143 steel steel NIBE S1155 Chapter 12 | Accessories...
  • Page 72: Technical Data

    Dimensions and setting-out coordinates * This dimension applies at 90° angle on the brine pipes (side connection). The dimension can vary approx. ±100 mm vertically as the brine pipes consist in part of flexible pipes. Chapter 13 | Technical data NIBE S1155...
  • Page 73: Electrical Data

    It is the responsibility of the installer or user of the equipment to ensure, through consultation with the distribution network operator if required, that the equipment is only connected to a supply with a short circuit power Ssc equal to or greater than 2.0 MVA. NIBE S1155 Chapter 13 | Technical data...
  • Page 74: Technical Specifications

    0/35 Sound pressure level (L dB(A) 21 – 28 21 – 32 21 – 32 21 – 32 calcu- lated values according to EN ISO 11203 at 0/35 and 1 m range Chapter 13 | Technical data NIBE S1155...
  • Page 75 0.68 1.45 1.45 Dimensions and weight Width x Depth x Height 600 x 620 x 1,500 Ceiling height 1,670 Weight complete heat pump Weight only cooling module 230 V: 110 400 V: 120 NIBE S1155 Chapter 13 | Technical data...
  • Page 76 COMPRESSOR OPERATION The compressor provides a supply temperature up to 65 °C at -5 °C incoming brine temperature. The working range below 75 % for S1155-6 and the Arbetsområde under 75% för F1155-1255 6kW, för hela arbetsområdet 12 och 16 kW.
  • Page 77 Specified heating output, kW (enhet) 100% °C Köldbärare in, temperatur Incoming brine temp, °C Dimensionering kompr. hastighet för F1155-1255 -12 kW 230 V. S1155-12 230V Avgiven värmeeffekt Specified heating output, kW 100% Text text bla bla Incoming brine temp, °C (enhet) °C...
  • Page 78 Specified cooling output, kW 100% °C Köldbärare in, temperatur Incoming brine temp, °C Framledningstemp. Värmebärare 50 °C för F1155-1255 -12 kW 230V. S1155-12 230 V Avgiven kyleffekt Specified cooling output, kW 100% °C Köldbärare in, temperatur Incoming brine temp, °C °C...
  • Page 79 Framledningstemp. Värmebärare 50 °C för F1155-1255 -12 kW. S1155-12 400 V Avgiven kyleffekt Specified cooling output, kW 100% °C Köldbärare in, temperatur Incoming brine temp, °C Framledningstemp. Värmebärare 50 °C för F1155-1255 -16 kW. S1155-16 Avgiven kyleffekt Specified cooling output, kW 100% °C...
  • Page 80: Energy Labelling

    Energy labelling INFORMATION SHEET Supplier NIBE AB Model S1155-6 1x230V S1155-12 1x230V Model hot water heater VPB S300 VPB S300 Temperature application °C 35 / 55 35 / 55 Declared load profile for water heating Seasonal space heating energy efficiency class, aver-...
  • Page 81 Supplier NIBE AB Model S1155-6 3x400V S1155-12 3x400V S1155-16 3x400V S1155-25 3x400V Model hot water heater VPB S300 VPB S300 VPB S300 VPB S300 Temperature application °C 35 / 55 35 / 55 35 / 55 35 / 55 Declared load profile for water heating...
  • Page 82 DATA FOR ENERGY EFFICIENCY OF THE PACKAGE Model S1155-6 1x230V S1155-12 1x230V Model hot water heater VPB S300 VPB S300 Temperature application °C 35 / 55 35 / 55 Controller, class Controller, contribution to efficiency Seasonal space heating energy efficiency of the...
  • Page 83 Daily energy consumption 7.73 Daily fuel consumption elec fuel Annual energy consumption 1,697 Annual fuel consumption Contact information NIBE Energy Systems – Box 14 – Hannabadsvägen 5 – 285 21 Markaryd – Sweden NIBE S1155 Chapter 13 | Technical data...
  • Page 84 Daily energy consumption 9.62 Daily fuel consumption elec fuel Annual energy consumption 2,112 Annual fuel consumption Contact information NIBE Energy Systems – Box 14 – Hannabadsvägen 5 – 285 21 Markaryd – Sweden Chapter 13 | Technical data NIBE S1155...
  • Page 85 Daily energy consumption 7.73 Daily fuel consumption elec fuel Annual energy consumption 1,697 Annual fuel consumption Contact information NIBE Energy Systems – Box 14 – Hannabadsvägen 5 – 285 21 Markaryd – Sweden NIBE S1155 Chapter 13 | Technical data...
  • Page 86 Daily energy consumption 9.62 Daily fuel consumption elec fuel Annual energy consumption 2,112 Annual fuel consumption Contact information NIBE Energy Systems – Box 14 – Hannabadsvägen 5 – 285 21 Markaryd – Sweden Chapter 13 | Technical data NIBE S1155...
  • Page 87 Daily energy consumption 7.73 Daily fuel consumption elec fuel Annual energy consumption 1,697 Annual fuel consumption Contact information NIBE Energy Systems – Box 14 – Hannabadsvägen 5 – 285 21 Markaryd – Sweden NIBE S1155 Chapter 13 | Technical data...
  • Page 88 Daily energy consumption 9.62 Daily fuel consumption elec fuel Annual energy consumption 2,112 Annual fuel consumption Contact information NIBE Energy Systems – Box 14 – Hannabadsvägen 5 – 285 21 Markaryd – Sweden Chapter 13 | Technical data NIBE S1155...
  • Page 89 Daily energy consumption 9.33 Daily fuel consumption elec fuel Annual energy consumption 2,048 Annual fuel consumption Contact information NIBE Energy Systems – Box 14 – Hannabadsvägen 5 – 285 21 Markaryd – Sweden NIBE S1155 Chapter 13 | Technical data...
  • Page 90 Water heating energy efficiency ƞ Daily energy consumption Daily fuel consumption elec fuel Annual energy consumption Annual fuel consumption Contact information NIBE Energy Systems – Box 14 – Hannabadsvägen 5 – 285 21 Markaryd – Sweden Chapter 13 | Technical data NIBE S1155...
  • Page 91: Item Register

    Temperature sensor, hot water top, 22 Supplied components, 7 Emptying the brine system, 61 Transport, 6 Energy labelling, 80 Diagram, dimensioning compressor speed, 77 Data for energy efficiency of the package, 82 Dimensions and pipe connections, 15 Information sheet, 80–81 NIBE S1155 Item register...
  • Page 92 Energy labelling, 80 Heating medium side, 16 Data for energy efficiency of the system, 82 Pipe dimensions, 15 Information sheet, 80 Symbol key, 14 Technical documentation, 83 System diagram, 15 Technical Data, 74 Pipe dimensions, 15 Item register NIBE S1155...
  • Page 93 Component list cooling section, 12 Component list electrical cabinets, 12 Component location cooling section, 12 Component location electrical cabinets, 12 Component locations, 10 List of components, 10 Transport, 6 Troubleshooting, 66 USB service outlet, 64 Working range heat pump, 76 NIBE S1155 Item register...
  • Page 95: Contact Information

    Tel: +46 (0)433-27 3000 kuzmin@evan.ru info@nibe.se nibe-evan.ru nibe.se SWITZERLAND NIBE Wärmetechnik c/o ait Schweiz Industriepark, CH-6246 Altishofen Tel. +41 (0)58 252 21 00 info@nibe.ch nibe.ch For countries not mentioned in this list, contact NIBE Sweden or check nibe.eu for more information.
  • Page 96 WS version: a1 (working edition) Publish date: 2020-04-29 10:32 This manual is a publication from NIBE Energy Systems. All product illustrations, facts and data are based on the available information at the time of the publication’s approval. NIBE Energy Systems makes reservations for any factual or printing errors in this manual.

Table of Contents