Installation - Miele ProLine CS 1012-2 Operating And Installation Instructions

Table of Contents

Advertisement

Installation

Installation
Preparing the countertop
 Make the countertop cut-out as
shown in the illustration in "Installa-
tion dimensions" or as calculated
(see "Installation" – "Installing several
ProLine elements"). Remember to
maintain the minimum safety dis-
tances (see "Installation" – "Safety
distances").
 Seal any cut surfaces on wooden
countertops with a special varnish,
silicone rubber, or resin to prevent the
wood from swelling as a result of
moisture. The sealant must be tem-
perature-resistant.
Ensure that the sealant does not get
on the top surface of the countertop.
The sealing strip ensures that the
cooktop will sit securely in the cut-out
without slipping. Any gap between the
frame and countertop will become
smaller over time.
42
Securing the spring clamps and
spacer bars – wooden countertops
 Position the spring clips  or spacer
bars  at the top edge of the cut-out
in the positions shown in the illustra-
tions.
 Secure the spring clips  or spacer
bars  with the
1/8" x 1" (3.5 x 25 mm) wood screws
supplied.
b

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proline cs 1012-2 lpProline cs 1012-2 g

Table of Contents