4.2 Web Panel

At the top of the Web management page, the active panel displays the link status of management port and PoE ports.
Green
light indicates network data is sending or receiving.
Orange
light indicates the PoE is in use.
Red
light indicates the PoE port does not have enough power to enable. (It will happen only if user
assigns lower power for PD in the Total Limit mode.)

4.3 System

The System function provides system information which also allows user to manage the PoE Injector Hub system as
4-2-2
is shown below:
The page includes the following information:
Object
 System Information
 IP Configuration
 NTP Configuration
 Password Setting
 Firmware Upgrade
Figure 4-2-1: Web panel screen
Figure 4-2-2: System Function Menu
Description
Display the MAC address, Software Version, Hardware Version, IP Address,
Subnet Mask, Gateway and Description.
Allow to change the IP subnet address of PoE Injector Hub.
section
4.3.2.
Allow to set system time by manual or synchronize system time from Internet
NTP server.
Explained in section
Allow to change the username and password of PoE Injector Hub.
section
4.3.4.
Allow to upgrade the latest firmware in the future.
23
User's Manual of HPOE-1200G / HPOE 2400G
Explained in section
4.3.3.
Explained in section
Figure
4.3.1.
Explained in
Explained in