Led Indicators; Injector Rear Panel - Planet HPOE-1200G User Manual

12/24-port 802.3at poe injector hub
Hide thumbs Also See for HPOE-1200G:
Table of Contents

Advertisement

Reset Button Pressed and Released
About 1 second
About 8 seconds
Be sure that you back up the current configuration of PoE Injector Hub before resetting PoE
Injector Hub or else the entire configuration will be erased when pressing the "RESET" button.

2.1.2 LED Indicators

The front panel LEDs indicates instant status of system power, Management port Link/Active and PoE port links, helps
administrator to monitor and troubleshoot when needed.
LED
Color
FAN1 Failed
Green
FAN2 Failed
Green
Power1
Green
Failed
Power2
Green
Failed
Power
Green
PoE In-use
Green

2.1.3 Injector Rear Panel

The rear panel of the PoE Injector Hub indicates an AC inlet power socket, which accepts input power from 100 to 240V
AC, 50/60Hz.
Figures 2-1-4 & 2-1-5
The following is the summary table of Reset button
Reboot the PoE Injector Hub.
Reset the PoE Injector Hub to Factory Default configuration.
The PoE Injector Hub will reboot and load the default IP
settings as shown below.
Function
Lights to indicate FAN1 has stopped.
Lights to indicate FAN2 has stopped. (Only for HPOE-2400G)
Lights to indicate power supply 1 has failed.
Lights to indicate power supply 2 has failed. (Only for HPOE-2400G)
Lights to indicate power on.
Lights to indicate that the port is in use and supplying 48V DC power.
show rear panel of the PoE Injector Hub.
Figure 2-1-4: HPOE-1200G Rear Panel
Figure 2-1-5: HPOE-2400G Rear Panel
User's Manual of HPOE-1200G / HPOE 2400G
functions:
Function
13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HPOE-1200G and is the answer not in the manual?

This manual is also suitable for:

Hpoe-2400g

Table of Contents