Download Print this page

JLG LT3 Operation And Safety Manual page 20

Lighting tower

Advertisement

1.5
1.5.7 LIGHTING TOWER PACK-UP
To pack-up the machine for storage or
transport, complete the set-up steps in
reverse order. Take special care when
lowering the mast to ensure the mast
section six V-cleat locates in the mast
section one V-plate.
Ensure the lighthead and the LED lights
are locked in the horizontal position when
stowed for transport or storage.
Fig 1.5.11 Lighthead Home Position
Before transporting, ensure that V-arm
attached to the top of mast section 6 seats
in the V-plate bolted to mast section 1
V-arm
V-plate
Fig 1.5.12
1001281353
Oshkosh Corporation Classification ‐ Restricted 
MACHINE OPERATION
JLG LT
JLG Industries (Australia) Pty Ltd
Oshkosh Corporation
3
Ensure the four outrigger arms are fully
retracted and locked by spring latch bolts.
The levelling jack legs are
stowed position. Jack leg winding handles
are vertical.
Fig 1.5.13 LT
3
Stowed.
inverted in
Page 1-20
28JUL22

Advertisement

loading

Related Products for JLG LT3