The DAC161S055EVM is a demonstration kit for the DAC161S055, a 16-bit, 1-channel, 5µs settling time,
Serial Interface digital-to-analog converter. The EVM allows users to evaluate the operation and
performance of the DAC161S055 data converter. The EVM features a small size layout that directly
connects onto the MSP430F5529 LaunchPad board.
...........................................................................................................................
Topic
1
DAC161S055 BoosterPack Components
2
Software Installation
3
DAC161S055 BoosterPack Setup and Operation
4
Board Layout
5
Bill of Materials
SNAU171 – August 2014
Submit Documentation Feedback
DAC161S055EVM Booster Pack User's Guide
.............................................................................................
.....................................................................................................
..................................................................................................
Copyright © 2014, Texas Instruments Incorporated
.................................................................
......................................................
DAC161S055EVM Booster Pack User's Guide
User's Guide
SNAU171 – August 2014
Page
2
3
7
10
14
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the DAC161S055EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments DAC161S055EVM

  • Page 1 SNAU171 – August 2014 DAC161S055EVM Booster Pack User’s Guide The DAC161S055EVM is a demonstration kit for the DAC161S055, a 16-bit, 1-channel, 5µs settling time, Serial Interface digital-to-analog converter. The EVM allows users to evaluate the operation and performance of the DAC161S055 data converter. The EVM features a small size layout that directly connects onto the MSP430F5529 LaunchPad board.
  • Page 2 LM4120 (U1) DAC161S055 (U2) Connector (JB, JD) MSP430 LaunchPad Connector (JA, JC) Voltage Reference DAC Output Connector (J1) Select Jumper (JVA) Figure 1. DAC161S055EVM Evaluation Board Table 1. Device and Package Configurations DEVICE PACKAGE LM4120IM5-4.1 SOT-23 DAC161S055CISQ WQFN-16 DAC161S055EVM Booster Pack User’s Guide SNAU171 –...
  • Page 3 Software Installation www.ti.com Software Installation Graphical User Interface (GUI) To use the DAC161S055EVM, install the DAC161S055 software: 1. The DAC161S055 software is located on the product page. Go to the product page, scroll down to the software section, and download the latest evaluation software.
  • Page 4 1. Open the MSP430 USB Firmware Upgrade application. By default, the application can be launched from Start >> Programs >> Texas Instruments >> MSP430 USB Firmware Upgrade Example. 2. Click Next to proceed on the first prompt; read and accept the license agreement, and click Next to continue.
  • Page 5 Software Installation www.ti.com Update USB Driver 1. Before launching the DAC161S055 software, connect the DAC161S055EVM board to a USB port of your PC. Go to Device Manager and find “MSP43-USB Example”. Right-click and select Update Driver Software. Figure 4. Driver Not Installed 2.
  • Page 6 Software Installation www.ti.com Figure 6. Driver Installed DAC161S055EVM Booster Pack User’s Guide SNAU171 – August 2014 Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 7 Connections 1. Attach the DAC161S055EVM BoosterPack onto the MSP430 LaunchPad using connectors, JA, JB, JC, and JD. The proper orientation of the LaunchPad and DAC161S055EVM is when the text “LaunchPad” and “2013 TI” are in the same direction. Figure 7. DAC161S055EVM Attached to MSP430 2.
  • Page 8 Figure 9. Selectable Fields in GUI 3. Quick start: (a) Write 01 to Command[7:0] and press the Write button to assert the CLR command. This command DAC161S055EVM Booster Pack User’s Guide SNAU171 – August 2014 Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 9 NOTE: The DAC161S0855 is a 1-channel device, but its register map allows up to 8 channels to be selected. The part only outputs to channel 0. SNAU171 – August 2014 DAC161S055EVM Booster Pack User’s Guide Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 10 Board Layout www.ti.com Board Layout Figure 10. Top Assembly Layer Figure 11. Top Layer Routing DAC161S055EVM Booster Pack User’s Guide SNAU171 – August 2014 Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 11 Board Layout www.ti.com Figure 12. Power Layer Routing Figure 13. Ground Layer Routing SNAU171 – August 2014 DAC161S055EVM Booster Pack User’s Guide Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 12 Board Layout www.ti.com Figure 14. Bottom Layer Routing Figure 15. Bottom Assembly Layer DAC161S055EVM Booster Pack User’s Guide SNAU171 – August 2014 Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 13 Board Layout www.ti.com Figure 16. DAC161S055EVM Schematic SNAU171 – August 2014 DAC161S055EVM Booster Pack User’s Guide Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 14 Bill of Materials www.ti.com Bill of Materials Table 2. DAC161S055EVM Bill of Materials Designator Quantity Value Description PartNumber Manufacturer !PCB Printed Circuit Board SV601045 CAP, CERM, 0.047 µF, 25 V, +/- 5%, X7R, 0.047uF 06033C473JAT2A 0603 C2, C5, C8, C9 0.1uF...
  • Page 15 ADDITIONAL TERMS AND CONDITIONS, WARNINGS, RESTRICTIONS, AND DISCLAIMERS FOR EVALUATION MODULES Texas Instruments Incorporated (TI) markets, sells, and loans all evaluation boards, kits, and/or modules (EVMs) pursuant to, and user expressly acknowledges, represents, and agrees, and takes sole responsibility and risk with respect to, the following: 1.
  • Page 16 RADIO FREQUENCY REGULATORY COMPLIANCE INFORMATION FOR EVALUATION MODULES Texas Instruments Incorporated (TI) evaluation boards, kits, and/or modules (EVMs) and/or accompanying hardware that is marketed, sold, or loaned to users may or may not be subject to radio frequency regulations in specific countries.
  • Page 17 Les types d'antenne non inclus dans cette liste, ou dont le gain est supérieur au gain maximal indiqué, sont strictement interdits pour l'exploitation de l'émetteur. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2014, Texas Instruments Incorporated spacer Important Notice for Users of EVMs Considered “Radio Frequency Products”...
  • Page 18 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.
  • Page 19 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments DAC161S055EVM...