Advertisement

Quick Links

Model
Main Breaker
Generator Breaker
Only qualified personnel should be working on the panel box
Please follow all rules and regulations of the National Electric Code
Step 1: Disassemble the interlock. Place the bottom plate (holes only) Below the top right breaker and mark
holes. Plate is parallel to top right breaker.

Step 2: Turn off main breaker and remove panel cover.

Step 3: Drill holes as marked on panel cover with supplied 3/16 drill bit and remove all burs from drilling cover.
Step 4: Insert screws from rear of cover, install bottom plate, and install top plate (slotted) with retaining nuts.
Ensure proper movement.
GE-200B
200 amp Vertical throw with main on bottom
Bottom right side 2 positions
An amateur should NEVER open the panel box
WARNING

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GE-200B and is the answer not in the manual?

Questions and answers

Summary of Contents for GenInterlock GE-200B

  • Page 1 GE-200B Model 200 amp Vertical throw with main on bottom Main Breaker Bottom right side 2 positions Generator Breaker WARNING Only qualified personnel should be working on the panel box An amateur should NEVER open the panel box Please follow all rules and regulations of the National Electric Code Step 1: Disassemble the interlock.
  • Page 2 Thank You for your support, GenInterlock Team DISCLAIMER: GenInterlock.com is NOT responsible for misuse or improper installation. All electrical equipment should be installed and maintained by qualified personnel. Any consequences arising from improper use is the responsibility of the user.
  • Page 3 GenInterlock.com Sales@geninterlock.com 732-339-4191...

Table of Contents