Flow Of The Preparations - Hitachi GR4000 Series Installation Manual

Hide thumbs Also See for GR4000 Series:
Table of Contents

Advertisement

GR4000 Installation Guide Version 1.00 - Preliminary
2.1

Flow of the Preparations

Figure 2.1-1below shows the flow of GR4000 installation. Plan ahead so that the work
for installing power supply, LAN cables, and other communication equipment can be
finished in time for the installation of the GR4000.
The installation of the GR4000, from deciding a system configuration to running a
system, should be done by the customer. However, Hitachi can offer installation
services system setup, and the field technical assistance at additional charge. For
details, contact Hitachi.
(1) What sort of and where the
router should be used ?
(2) Check environment where the
router is to be placed.
(4) Decide on an installation layout.
(5) Prepare facility equipment.
(cables,rack, etc.)
(6) Installation for power supply
and WAN/LAN cable setting
(8) HITACHI delivers the router.
(9) Perform installation of router.
(10) Setup configuration.
(11) Test system cooperation.
(12) Place router in service.
: Customer responsibility
: Vendor responsibility
Figure 2.1-1 Flow for the preparations for installing the GR4000
58
Unnecessary when you do not use a leased line
(3) Apply for a leased line.
(7) Line setup
(done by carriers)
(Note 1)
(Note 1)A device is handed over to the customers at the
entrance.
(Note 2) The task HITACHI can do for the customers with
(Note 2)
charge.
(Note 3) HITACHI can preinstall the configuration information
in a device before the shipment with charge. In this
(Note 3)
case, you should send the information necessary to
set a configuration to the works in advance. For
details, contact HITACHI.
(Note 4)
(Note 4)HITACHI offers the service of the field assistance for
a test on system cooperation and the trouble
diagnosis as well as the installation of a device with
charge.
520-10-014-20X

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents