Additional Installation/Replacement Of Double-Size Nif - Hitachi GR4000 Series Installation Manual

Hide thumbs Also See for GR4000 Series:
Table of Contents

Advertisement

Figure 5.7-4 Network interface board being inserted into the slot
Step 2
indicated in the figure below, and fold its levers to the indicated direction. (The network
interface board will be inserted into the slot completely.)
Lever
Figure 5.7-5 Network interface board being locked
*
Step 3
!
Step 4
(As for the attachment of an interface cable, refer to the section 4.10 Connecting
Interface Cables to the GR4000. )

5.7.2 Additional installation/replacement of double-size NIF

WARNING: The replacement of a network interface board should be done by a trained
!
520-10-014-20X
Insert the network interface board into the slot until it reaches the position
NOTE: When inserting a network interface board into the slot, do it holding its levers so
that its connector part is fixed into its position correctly. When moving levers,
do it slowly without giving much pressure to them.
Fasten the screws of the network interface board.
Caution: Use a driver when screwing up a packet routing unit, and make sure that it is
fixed into its position firmly.
Attach the network interface cable to the network interface board.
engineer or a qualified maintenance person.
Caution: Do not touch the electronic components on the solder side of a network
interface board. To avoid damage, always store these components in approved
anti-static bags.
GR4000 Installation Guide Version 1.00 - Preliminary
Lever
193

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents