Application

The machines are used in basic preparations, Driveway, foundation, curbs and also
could be suitable to repair and maintenance jobs such as Streets, highways and sidewalks

Preparation work before starting

Checking before starting
Checking must be executed before working time or after 4 hours from working start. If
you need more
detailed guidance, please read section"Maintenance".Don't operate
machine before troubleshooting if there is any malfunction.
1. Check the machine thoroughly for signs of damage. Make sure that all guards are in
place and are reliable.
2. Check hoses, filling mouth, if there is leak of the drain plug and elsewhere. Operate
After repairing the leak.
3. Check the engine oil level, and add enough engine oil.
3.1 Put the machine on a level surface and check the engine oil level.
3.2 Remove oil-measuring tools, and observe the oil plane reaches rim. Use correct
appropriate viscosity of engine oil.(SAE 10W-30 suggested)
4. Check engine fuel plane and add enough fuel. Ensure use clean fuel. contaminated fuel
can damage the fuel system.
5. Check the air filter if it is clean, the accumulation of excessive dust and impurities within
the filter will affect engine operation. If the filter element is contaminated, please clean
it.(Refer to Section "Maintenance")
6. Check the operation of control functions. Make sure the drive rod, the vibration control
lever, throttle lever, parking brake lever and back safety device move smoothly.