Structure And Installation; Pm335J Transformer Unit - Projecta IntelliJay PM300-BTJ Instruction Manual

12v power management system mppt
Table of Contents

Advertisement

3. STRUCTURE AND INSTALLATION

3.1 PM300-BTJ and PM335J-NODE Power Management Systems
24
9
8
7
6
5
N
LABEL
O
1
AC Mains
2
Temp Sensor
3
LCD Display
4
Power switch
5
Fresh water tank 1
6
Fresh water tank 2
7
Tap water tank 3
8
Waste water tank 4
9
House Sensor
10
Solar+
11
Solar-
12
Vehicle Bat+
13
House Bat+
14
Vehicle Bat-
15
House Bat-
16
L1+
17
L2+ ~ L9+
18
L10+
19
L11+
20
L12+
21
L13+
22
L14+
23
L1- ~ L14-
24
Remote ISO Switch
25
Fuse
22 21 20
1918
23
Figure 8 Front panel of PM335J Transformer Unit
DEFINITION
AC input port
Comm port
Comm port
Charger and house battery
switch
For temp compensation
Solar input
Solar input
Vehicle battery+
House battery+
Vehicle battery-
House battery-
Always ON
HWS (Hot Water System)
Water pump
Slide out
Awning
Spare/CF (Fridge)
Terminal block
Table 3 Categorised outputs
17
16 15 14 13 12 11 10
4
DESCRIPTION
Computer/IEC style plug socket
Temperature Sensor input
Connect to Monitor
Manual battery switch
Connect to fresh water tank 1
Connect to fresh water tank 2
Connect to tap water tank
Connect to waste water tank
Connect to house battery
Connect to solar panel + terminal
Connect to solar panel - terminal
Connect to vehicle battery+ (<20Vdc)
Connect to house battery+ (<20Vdc)
Connect to vehicle battery-
Connect to house battery-
Connect to permanent +12 Volts
Connect to isolating +12 Volts
Connect to HWS+
Connect to water pump+
Connect to slide out+
Connect to awning+
Connect to CF+
Connect to DC load-
Connect to external switch (optional)
Fuse and fuse failure indication
25
2
1
3
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intellijay pm335j-node

Table of Contents