Page 2
Reorder P/N: UC5-BC-VS01-INST Rev C (Versatile Sx275) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
Introduction Congratulations on your purchase of the NORAC UC5 Spray Height Control System. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
Technical Specifications CAN ICES-3(A)/NMB-3(A) This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules.
Page 9
List of Parts Item Part Number Name Quantity 44706-01 KIT CABLE TIE BLACK 10 PCS 21 IN 150 PCS 7.5 IN 44728 MOUNTING BRACKET COMPLETE UC4 BREAKAWAY EXTENDED 44743 MOUNTING BRACKET MAIN LIFT SENSOR UC4 PLUS 43220-10 CABLE UC5 NETWORK 14 AWG 10M 43220-01 CABLE UC5 NETWORK 14 AWG 1M 43210-03...
Page 10
SIZE FACE P - PIPE The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
Pre-Install Checklist The pre-install checklist is necessary to check the existing sprayer functionality before the installation. 1. Unfold the sprayer over a flat, unobstructed area (i.e. no power lines…etc.). 2. Ensure all boom-fold operations are functional (place a check mark in boxes below). 3.
Ultrasonic Sensor Installation Bracket Assembly Assemble the breakaway sensor bracket as illustrated in Figure 5, following the instructions below. Figure 5: Breakaway Bracket Assembly 1. Compress the spring and insert it together with the collar into the base. 2. Slide the tube through the assembled part. 3.
Page 13
Ultrasonic Sensor Serial Number Arrangement When installing the UC5 sensors, start with the smallest serial number on the left-hand side, and proceed to the largest serial number on the right hand side. Each UC5 sensor has a serial number stamped on the sensor housing. Apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
Page 14
Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error. These rules should be followed for both the wing sensors and the main lift (middle) sensor. 1. In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground (A). 2.
Page 15
If the sensor is mounted to this portion of the boom, the system will force the boom downwards towards the ground as the boom folds backwards. 3. Mount the NORAC UC5 ultrasonic sensor into the sensor bracket and run the sensor cable through the sensor tube.
Page 16
Boom Block Removal 1. Remove boom blocks which limit the movements of the top left and right cylinders. Boom Block Location Figure 10: Boom Block Location (shown with block removed)
Page 17
Main Lift Sensor Installation Figure 11: Main Lift Bracket Assembly 1. There are a variety of ways to mount the main lift bracket on most sprayers. The bracket should position the sensor approximately in the center of the sprayer, forward of the boom.
Roll Sensor Installation Bracket Assembly 1. Securely mount the roll sensors to the included roll sensor brackets using the #6 machine screw and nylon lock-nuts. 2. The orientation of the mounted roll sensor to the roll sensor bracket will depend on the bracket mounting.
Page 19
Roll Sensor Mounting Guidelines: Center Pivot Booms 1. When mounting the roll sensors, mount one to the boom frame and one to the chassis (non-pivoting portion of the sprayer). For optimal performance, minimize the distance between the roll sensors (A) and minimize the height from each roll sensor to the pivot point (B) Figure 15: Roll Sensor Mounting on a Center Pivot Suspended Boom 2.
Page 20
Roll Sensor Mounting on a Versatile Sprayer Figure 17: Roll Sensor Mounting (viewed from the rear of sprayer)
Module Installation An optional module mounting bracket kit is available for purchase from NORAC. mounting brackets are compatible with control modules and input modules. One kit is needed per module. Item Part Number Name Quantity 43708 UC5 MOUNTING BRACKET KIT (CONTROL AND INPUT MODULES) Control Module 1.
Page 22
Valve Module 1. Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin Deutsch (CANbus) connectors towards the “P” and “T” ports with the label facing up. Output Number Normal Function Left Up Left Down...
Page 23
Figure 21: Valve Module Bracket Installation 5. Connect the valve module CANbus to cable C01 from the control module. Route cable C02 from the other CANbus connector to the input module. 6. With the valve module securely mounted to the valve block, connect the valve cables (C10), to the valve coils.
Page 24
Input Module 1. Install the input module (E03) on the boom near the sprayer valve block. Secure it to the boom using cable ties or optional brackets. 2. Connect the free end of the CANbus cable (C02) from the valve module to the input module.
Connecting the Sensors to the CANbus 1. Route cable C03 from the input module to the 8-way coupler (E11). 2. Connect both roll sensors to the 8-way coupler. Fasten the 8-way coupler to the boom with cable ties. 3. Connect the main lift sensor to the 8-way coupler using cable C04 and a 2-way coupler (E12).
Component failure due to oil contamination is not covered under the NORAC UC5 system warranty. It is recommended that a qualified technician perform the hydraulic installation.
Page 27
10.2 Valve Block Mounting 1. A good mounting location for the valve block on the Versatile is illustrated in Figure 26. 2. Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes are 3/8”...
Page 28
6. Connect the two (H03) hoses to the pressure and the tank tees (F02) that were just installed. 7. Connect the other end of the hoses (H03) to the pressure and tank ports on the NORAC valve block. Ensure they pass above the main lift hoses.
11 Software Setup 1. Start up your sprayer and test the sprayer’s functionality. The display terminal does not need to be powered on for the original boom function switches to operate. Unfold the booms and raise/lower each boom and the main section. Confirm that the cabling and hoses are agreeable to the entire range of motion.