3. Install Hanger
• As fig.8 Insert the two heads into two φ5
Fig.8
Holes in the right side of column, make
sure R heads, hook is upward.
• Install side cover A and cover D, fasten
With screws as Fig. 6
Fig.9
4. Lifting and installation
Take off two pieces of screws by spanner
(Fig. 9). Use hoist to lift the machine, move
pallet, locate the machine.
Power and Air Connections and Regulator
• Before installation, check if the power source
and the compressed air are in accordance with
the specifications on the nameplate. Any
Fig.10
electrical connection should be done by the
specially trained technician.
• The power socket should be at a place within
the sight of the operator. The height should be
between 24"~67".
• Grounding protection of power is needed for
machine shell.
• Air connection:Connect the inflation gun A to
Barometer (Fig.10) .
• Connect the compressed air supply to the coupling
located between the lubricator and the air filter S
(as fig.10, direction of arrow).