Operation - Shindaiwa EB633RT Operator's Manual

Table of Contents

Advertisement

OPERATION

7.
Assemble straight pipe (K) onto
swivel pipe, until you feel light
resistance. Do not force
connection. Hold swivel pipe
and turn straight pipe
clockwise, engaging positive
locking channels, until
connection is firm. Do not force
connection.
8.
Assemble straight pipe with
decal (J) to straight pipe as in
step 7.
Note: Blower use will eventually loosen pipe connections. Exclusive
positive locking system allows pipes to be tightened. If
loosening occurs, remove two straight pipes and install
according to instructions 7 & 8.
OPERATION
Moving parts can amputate fingers or cause severe injuries.
Keep hands, clothing and loose objects away from all openings.
Always stop engine, disconnect spark plug, and make sure all
moving parts have come to a complete stop before removing
obstructions, clearing debris, or servicing unit. Blower housing
might contain shredder blades and other sharp edges that can
cause serious injuries if touched, even if engine is off and
blades are not moving. Wear gloves to protect hands from sharp
edges and hot surfaces.
Operation of this equipment might create sparks that can start
fires around dry vegetation. This unit is equipped with a spark
arrestor to prevent discharge of hot particles from the engine.
Contact local fire authorities for laws or regulations regarding
fire prevention requirements.
18
E
K
C
© 04/22 ECHO Incorporated
EB633RT
J
X7531124908

Advertisement

Table of Contents
loading

Table of Contents