Download Print this page

Turnstiles HZ-SWGS01 Installation Manual

Swing gate turnstiles

Advertisement

Quick Links

INSTALLATION MANUAL
HZ-SWGS01 SWING GATE
Revision
Date
0
2017-07-02 New template
1
2018-05-12 Manual update
---
---
FOR
TURNSTILES
Description
---
Initials
LR
KN
---

Advertisement

loading
Need help?

Need help?

Do you have a question about the HZ-SWGS01 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Turnstiles HZ-SWGS01

  • Page 1 INSTALLATION MANUAL HZ-SWGS01 SWING GATE TURNSTILES Revision Date Description Initials 2017-07-02 New template 2018-05-12 Manual update...
  • Page 2: Table Of Contents

    Index Chapter 1 – INTRODUCTION ......................... 3 1.1. Product features ..........................3 1.2. Product specifications ........................3 1.3. Product dimensions ........................... 4 Chapter 2 – INSTALLATION ......................... 10 Chapter 3 – TROUBLESHOOTING AND SUPPORT ..................11 Page 2 of 11...
  • Page 3: Chapter 1 - Introduction

    Chapter 1 – INTRODUCTION This manual will address dimensions and the features of the HZ-SWGS01 turnstile while also covering the process in which this turnstile is installed. 1.1. Product features The HZ-SWGS01 swing gate turnstiles have the following features: Material: standard 304 stainless steel, with the option of getting 316 stainless steel, and acrylic panels and flaps.
  • Page 4: Product Dimensions

    1.3. Product dimensions Top View Single Movement Front View Single Movement Page 4 of 11...
  • Page 5 Top View Single Movement ADA Front View Single Movement ADA Page 5 of 11...
  • Page 6 Top View Double Movement Front View Double Movement Page 6 of 11...
  • Page 7 Top View Double Movement ADA1 Front View Double Movement ADA1 Page 7 of 11...
  • Page 8 Top View Double Movement ADA2 Front View Double Movement ADA2 Page 8 of 11...
  • Page 9 Side View Four Lane Layout Page 9 of 11...
  • Page 10: Chapter 2 - Installation

    Chapter 2 – INSTALLATION Before proceeding to the installation of the turnstile, unpack all components and check to make sure the all parts from the packing slip are included, verify dimensions and conduit runs. Use the turnstile template to properly align and lay out the site and to determine the right location of the floor stub-ups and anchors.
  • Page 11: Chapter 3 - Troubleshooting And Support

    For physical installation setup refer to the following drawing. Floor anchor installation Chapter 3 – TROUBLESHOOTING AND SUPPORT For Troubleshooting and Support, please contact HZ Security Inc.: Tel: +1.631.300.4000 Email: techsupport@turnstileshz.com Website: http://www.turnstileshz.com Page 11 of 11...