INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN

CONNECTIONS

15. WATER CONNECTION

Incoming water must be drinking water with the
following properties:
• Degree of hardness 0.5-3.5° dH or 0.5-5° fH
to reduce the risk of liming inside the steam
generator (vessel).
• A high concentration of chloride ions must
be avoided (acceptable level -10ppm). Chlo-
ride ions may cause damage to stainless steel
surfaces inside the appliance.
• Pan with hand shower connected to hot and
cold water. Pan without hand shower con-
nected to cold water.
• Shut-off valve and check valve should be in-
stalled on incoming water lines (not supplied
with the pan).
• To comply with EN 1717 "Protection against
pollution of potable water..." above mentioned
non return valve should be controllable, such
as type EA-protection module.
Cold water connection:
150-600 kPa(1.5-6bar) at 30 l/min. DN 20(g3/4")
male thread.
Hot water connection:
150-600 kPa (1.5-6 bar) at 18 l/min. DN
15(g1/2") internal thread.
15.1 Ice water connection for option
ice water cooling
Incoming ice water connection shall be fitted
with adjustable pressure reducing valve (not in-
cluded in delivery).
Intake ice water connection (1.1-1.7 bar) DN25
(g1") male thread.
Outlet ice water connection (depressurized)
DN25 (g1") male thread.

15.2 Filling pressure vessel with water

Should be performed by trained personnel. Be-
fore the pan is started up, the pressure vessel
must be filled with water (see also Operating
Instructions).
• Press Tilting
and set the pan at an incline
of approximately 45°.
• Remove the plug on the rear of the pan and
turn the knob 90°. See operation instructions
Fig. 1(pos.20)
• Fill water through the nipple up to the hole.
EN | 10-2018
• Press Tip return
working position. Surplus water will run out
until the correct water level is achieved in the
pan.
• Turn back the knob and reinstall the plug See
Fig. 1(pos.20). Ensure that the gasket is still in
the plug. Check that water or steam leakage
does not occur, when the pan has reached
working pressure.
NOTE
Please follow these instructions
The water level in the vessel should be checked
at least once per quarter.
For optional jacket cooling or ice water
cooling:
For boiling pans with optional jacket cooling or
ice-water cooling the pressure vessel fills with
water by starting the COOLINg program, see
operating instruction.
For optional level control:
When the boiling pan is energized, the vessel will
be filled with water automatically to the correct
level.
NOTE
Please follow these instructions
• Water must be plugged in before the boiling
pan is energized.
• If the level control does not signal to stop fill-
ing water,
If the drinking water has low values of miner-
als, other settings may need to be done on
the level control.
- Change from UP-LS to UP-HS (See image
below)
- Adjust down (Sensitivity) 100% to approx.
75% (need to be checked on site).
DOC N° ST0 9183-02
and return the pan to the
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smart variomixSmart promix

Table of Contents