Cut And Plan Views; Installation; Location; Uncrating The Stand - Hussmann RBB Installation And Operation Manual

Upright back bar deli case
Hide thumbs Also See for RBB:
Table of Contents

Advertisement

rev. 0608

location

The refrigerated merchandisers have been designed for
use only in air conditioned stores where temperature and
humidity are maintained at or below 75°F and 55% relative
humidity. DO NOT allow air conditioning, electric fans, ovens,
open doors or windows (etc.) to create air currents around
the merchandiser, as this will impair its correct operation.
Product temperature should always be maintained at a
constant and proper temperature. This means that from the
time the product is received, through storage, preparation
and display, the temperature of the product must be
controlled to maximize life of the product.

uncrating the stand

Place the fixture as close to its permanent position as
possible. Remove the top of the crate. Detach the walls
from each other and remove from the skid. Unbolt the case
from the skid. The fixture can now be lifted off the crate
skid. lift only at base of stand!

exterior loading

These models have not been structurally designed to
support excessive external loading. do not walk on their
tops; This could cause serious personal injury and damage
to the fixture.

setting and Joining

The sectional construction of these models enable them to
be joined in line to give the effect of one continuous display.
A joint trim kit is supplied with each case.

cut and plan views

24"
Optional
Shelves
12"
Display Area
Light
Condiment
Shelf
12"
Adj. Shelves
36"
RBB
VARIABLE LENGTHS
1"
8"
Electrical
PLAN VIEW SINGLE CASE

installation

leveling

iMpOrtaNt! it is iMperative that cases be
leveled FrOM FrONt tO back aNd side tO side
priOr tO JOiNiNg. a level case is NecessarY
tO iNsure prOper OperatiON, Water draiNage,
glass aligNMeNt, aNd OperatiON OF the hiNges
suppOrtiNg the glass. leveliNg the case
cOrrectlY Will sOlve MOst hiNge OperatiON
prObleMs.
NOTE:
A. To avoid removing concrete flooring, begin lineup
leveling from the highest point of the store floor.
B. When wedges are involved in a lineup, set them first.
All cases were leveled and joined prior to shipment to
insure the closest possible fit when cases are joined in
the field. When joining, use a carpenters level and shim
legs accordingly. Case must be raised correctly, under legs
where support is best, to prevent damage to case.
1. Check level of floor where cases are to be set.
Determine the highest point of the floor; cases will
be set off this point.
2. Set first case, and adjust legs over the highest part of
the floor so that case is level. Prevent damage - case
must be raised under leg or by use of x6 or x4 leg
brace. Remove side and back leg braces after case
is set.
3. Set second case as close as possible to the
first case, and level case to the first using the
instructions in step one.
4. Apply liberal bead of case joint sealant (butyl) to
dotted area shown in (Figure on page 4) of first
case. Apply heavy amount to cover entire shaded
area.
3
1"
8"
C L
Refrigeration
Drain
FRONT
RBB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Chino rbb

Table of Contents