Hot Air Delivery Connection; Hood Liner - Palazzetti MX 25:9F Installation And Maintenance Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 33
B
F
Product images are for illustrative
purposes only
The ecomonoblocco is equipped, on the front
bottom, with a special flange (D) for the inlet of
combustion air.
The heat recovery grate (E) supplied with the
product must be positioned on the top part of
the lining.
52

7.8 Hot air delivery connection

7.8.1 Hood liner fitting for heating in a single
room
E
Attach the flexible ducts (Ø 140 mm) for the
distribution of hot air to the front outlet vents,
above the hood, securing them with the clamps
(Fig. 17: A-clamps, b-distribution ducts, c-vents).
D
A
A
Fig. 16
Product images are for illustrative
purposes only

7.9 Hood liner

For constructing of the hood liner it is recom-
mended to use flame-retardant plasterboard .
During creation of the hood it is essential to pro-
tect the door sliding frame with nylon to prevent
dust, mortar or other foreign bodies damaging
the sliding system. Remove this protection when
the work is completed.
Provide cladding inspection panels for the
maintenance of mechanical and/or electronic
assemblies.
Before carrying out the final assembly it will be
advisable to carry out a smoke test, i.e. to test the
operation of the appliance.
B
004778930 - 06/12/2021
C
Fig. 17

Advertisement

Table of Contents
loading

Table of Contents