12.Test operation
1. Prepare for test
(1) Do not turn on the power switch before all installation is finished.
(2) Connect wires correctly and firmly.
(3) Open the check valve.
(4) Remove all dust.
2. Testing
(1) Turn on the power switch and press ON/OFF button.
(2) Press MODE button select COOL, HEAT, FAN, etc to test whether it operates normally.
3. Emergency operation.
When the batteries fail or when the remote controller is missing, operate as shown below.
* On stopping you can press the AUTO button on cover NO.Ⅱ, until it is in AUTO mode.
The cover NO.Ⅱis the part of the panel. As the below picture .
59