Setting-Up Requirements; Installation Location; Environmental Conditions; Infrastructure - Laird LA 5000 Operation Manual

Liquid-air cooling unit
Table of Contents

Advertisement

4.5 Setting-up Requirements

4.5.1 Installation Location

• The location must be even.
• When choosing the installation location the following must be kept in mind: the air flow of the cooling
air must not be restricted, forward and back flow connections must be easily accessable and all tubes
must be installed without sharp bends.

4.5.2 Environmental Conditions

CAUTION
Risk of damage through unsuitable environmental conditions.
Damage to property and corrosion damage may result and are not covered by manufacturer's
liability.
• The unit is only authorized for use in indoor environments.
• The unit must not be stored or operated in agressive, humid environments.
• The unit must not be stored or operated outdoor.
Pay attention to the environmental conditions as given in the specifications on page 16.

4.5.3 Infrastructure

The following infrastructure is required for connecting the unit:
Parameter
Operating voltage
Table 9:
Required infrastructure
Laird Thermal Systems s.r.o
17
Operation Manual, 387009851
Rated value
230±10% VAC, 1Ph, 50/60 Hz
Date: 08/09/2022
Version: 1.0
Product Description
Setting-up Requirements
Liquid-Air Cooling Unit LA 5000
387009381

Advertisement

Table of Contents
loading

Table of Contents