"Close" for handling the scheduling schemes. These are shown in Figure 4-4.
Figure 4-4 Operations for the Schedule Scheme Manipulation
Load...
This button is used for loading other pre-edited schedule schemes from the specified
directory. Note that you will need to save the current-edited settings before applying
this function. Otherwise, any editing changes will be lost.
Undo
This button is used for undoing all plotting markers for this schedule scheme from
the last save.
Clear
This button is used for clearing all plotting markers in the current-editing schedule
scheme of the selected channel.
Save
This button is used for saving the editing changes for the current schedule scheme.
Save as...
This button is used for saving the current-edited schedule scheme to another file
name instead of the default name.
Close
This button is used for closing the scheduling. Any unsaved setting will be lost.
4.3 Primary Schedule
4.3.1 Schedule with Time Lines
There are two time-lines of different scales: hour unit time-line and week unit
Management & Control Software User's Manual
4-51
- –