Advertisement

Quick Links

This user's guide describes the function, installation, and operation of the TPA6130A2EVM. Also included
are the schematic diagrams, printed-circuit board (PCB) layouts, and the bill of materials (BOM).
...................................................................................................................
1
Introduction
.....................................................................................................................
2
3
TPA6130A2EVM Schematic
4
TPA6130A2EVM PCB Layers
5
TPA6130A2EVM Parts List
1
Place Shunts Horizontally Across SCL and SDA
2
3
4
5
2
6
7
8
9
10
11
12
1
TPA6130A2EVM Parts List
1
Introduction
1.1
Description
The TPA6130A2 is a stereo, capacitor-free headphone driver with I
TPA6130A2 has minimal quiescent current consumption, a flexible, 64-step, audio tapered volume control
and channel independent enables and mutes.
1.2
TPA6130A2EVM Specifications
VDD
Supply voltage range
IDD
Supply current
PO
Continuous output power per channel, 16 Ω, VDD = 5 V, THD + N = 1%
RL
Minimum load impedance
Microsoft, Windows are registered trademarks of Microsoft Corporation.
SLOU185A - October 2006 - Revised September 2014
Submit Documentation Feedback
...............................................................................................
..............................................................................................
...............................................................................................
List of Figures
.................................................................................
........................................................................................................
...........................................................................................................
................................................................................................
...............................................................................................
..............................................................................................
................................................................................................
.................................................................................................
..........................................................................................
List of Tables
...............................................................................................
Copyright © 2006-2014, Texas Instruments Incorporated
SLOU185A - October 2006 - Revised September 2014
Contents
........................................................................
.........................................................
.........................................................
2
C digital volume control. The
User's Guide
TPA6130A2EVM
-0.3 V to 5.5 V
0.5 A Maximum
138 mW
16 Ω
TPA6130A2EVM
1
2
7
8
10
2
2
3
4
5
6
6
7
8
8
9
9
10
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPA6130A2EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPA6130A2EVM

  • Page 1: Table Of Contents

    User's Guide SLOU185A – October 2006 – Revised September 2014 TPA6130A2EVM This user's guide describes the function, installation, and operation of the TPA6130A2EVM. Also included are the schematic diagrams, printed-circuit board (PCB) layouts, and the bill of materials (BOM). Contents ........................
  • Page 2: Operation

    Operation www.ti.com Operation The TPA6130A2EVM can be evaluated in a stand-alone mode or when connected to existing circuits with C controls. Quick Start List for Stand-Alone Operation A desktop or laptop with Microsoft Windows 7 installed is required in the stand-alone operation. Connect ®...
  • Page 3: Shunts Across Jp1 Powered With An External Power Supply

    GND (J7) banana jacks, taking care to observe marked polarity. 5. Connect audio source to J4 and J3. 6. Connect headphones to J2. 7. If this is the first time you plug in a TPA6130A2EVM after installing the software, follow this set of Windows dialog, questions, and selections: •...
  • Page 4: Starting The Software

    1. Start the TPA6130A2 Interface by clicking the Start menu and clicking on the TPA6130A2 Interface icon. Figure 4. Starting the Software TPA6130A2EVM SLOU185A – October 2006 – Revised September 2014 Submit Documentation Feedback Copyright © 2006–2014, Texas Instruments Incorporated...
  • Page 5: Software Interface

    To hear an output, enable and unmute each channel, and set the gain to a higher level 3. Follow these steps if the host PC running the TPA6130A2EVM GUI is also the music source. When using Windows 7, if, after initially installing the software, the PC does not play music out of the headphone jack: (a) Open the Control Panel.
  • Page 6: Connect I 2 C Controls To Jp3

    Quick Start List When Connected to Existing Circuits With I C Controls The TPA6130A2EVM can be easily connected to existing circuits with I C controls. Connections to the EVM module can be made using banana plugs for the power supply. The inputs accept standard RCA plugs.
  • Page 7: Tpa6130A2Evm Schematic

    TPA6130A2EVM Schematic www.ti.com TPA6130A2EVM Schematic Figure 8 shows the TPA6130A2EVM schematic. Figure 8. TPA6130A2EVM Schematic SLOU185A – October 2006 – Revised September 2014 TPA6130A2EVM Submit Documentation Feedback Copyright © 2006–2014, Texas Instruments Incorporated...
  • Page 8: Tpa6130A2Evm - Top Layer

    TPA6130A2EVM PCB Layers Figure 9 through Figure 12 illustrate the TPA6130A2EVM PCB layers. Figure 9. TPA6130A2EVM – Top Layer Figure 10. TPA6130A2EVM – Layer 2 TPA6130A2EVM SLOU185A – October 2006 – Revised September 2014 Submit Documentation Feedback Copyright © 2006–2014, Texas Instruments Incorporated...
  • Page 9: Tpa6130A2Evm - Layer

    TPA6130A2EVM PCB Layers www.ti.com Figure 11. TPA6130A2EVM – Layer 3 Figure 12. TPA6130A2EVM – Bottom Layer SLOU185A – October 2006 – Revised September 2014 TPA6130A2EVM Submit Documentation Feedback Copyright © 2006–2014, Texas Instruments Incorporated...
  • Page 10 TPA6130A2EVM Parts List www.ti.com TPA6130A2EVM Parts List Table 1 lists the TPA6130A2EVM BOM. Table 1. TPA6130A2EVM Parts List Reference Description Size MFR/ Part No. Vendor No. C1, C2, C3, Capacitor, ceramic, 2.2 μF, ±10%, X5R, 10 0603 Kemet Digi-Key C4, C8...
  • Page 11 Revision History www.ti.com Table 1. TPA6130A2EVM Parts List (continued) Reference Description Size MFR/ Part No. Vendor No. JP1–JP6 SHUNT, 2mm Specialty 2JM-G (shunts) WCSP TI TPA6130A2 Headphone amplifier with I C controls USB Streaming Controller TI TAS1020BPFB 3.3V LDO Regulator with reset output...
  • Page 12 STANDARD TERMS AND CONDITIONS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, or documentation (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms and conditions set forth herein. Acceptance of the EVM is expressly subject to the following terms and conditions.
  • Page 13 FCC Interference Statement for Class B EVM devices NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 14 【無線電波を送信する製品の開発キットをお使いになる際の注意事項】 本開発キットは技術基準適合証明を受けておりません。 本製品のご使用に際しては、電波法遵守のため、以下のいずれかの措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用 いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。 上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・インスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル 3.3.3 Notice for EVMs for Power Line Communication: Please see http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 電力線搬送波通信についての開発キットをお使いになる際の注意事項については、次のところをご覧くださ い。http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page SPACER EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS.
  • Page 15 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2014, Texas Instruments Incorporated...
  • Page 16 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.
  • Page 17 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments TPA6130A2EVM...

Table of Contents