Start Flow Test (to check for leaks).
10.
Press the "O" button, to turn on the display, then press < (Arrow button 3
11.
times) to reach the screen showing FLOW TEST. Press the "O" button to start
the test.
The test runs for 120 seconds. If "N" doesn't increase...no leaks the test is passed. (Skip to
Step 14).
If "N" shows pulses, immediately close the stopcock and check inside customer's premise for
leaks. Repeat steps (after the leak is repaired) 9, 10, 11 and 12.
If no pulses (N) or volume accumulated, continue with standard re-lighting procedures per
your utility practices.
Make sure that the Soap/sniff meter connection has no leaks
Last Step:
Activate cellular communication Push the left arrow button on the meter to turn
on the display, press the left arrow button a 2
screen, and press and hold down the "O" button for 2-3 seconds until the display
shows CAT M-1 switching on.