HAKO PowerBoss Phoenix 26 User Manual page 24

Hide thumbs Also See for PowerBoss Phoenix 26:
Table of Contents

Advertisement

PowerBoss
System Maintenance II
The following maintenance works are to
be performed by an authorized PowerBoss
Service workshop.
To Be Performed
Perform maintenance according to System Maintenance I
Inspect steering rollers for tread damage and bearing slackness and replace if required
Check drain hose from the recovery tank and replace if required
Check roller bumper of the brush deck and replace if required
Check suction hose for a tight fi t and damages and replace if required
Check squeegee caster wheels and replace if required
Test drive and function test
Page 24
®
Interval
Every 250 hours of
operation
o
o
o
o
o
o
o

Advertisement

Table of Contents
loading

Table of Contents