Hardware Installation - D-Link DIS-100G-5PSW Quick Installation Manual

Industrial unmanaged switch with 4 10/100/1000base-t poe ports and 1 1000base-x sfp port
Hide thumbs Also See for DIS-100G-5PSW:
Table of Contents

Advertisement

Available languages

Available languages

(Ports 2-5)
Off
DIP-switches
Pin №
State
Pin 1
ON
OFF
Pin 2
ON
OFF

Hardware Installation

DIN-Rail Mounting
Mounting steps:
1. Screw the DIN-Rail bracket on with the bracket and screws in the accessory kit.
2. Hook the unit over the DIN-Rail.
3. Push the bottom of the unit towards the DIN-Rail until it snaps into place.
Wall Mounting
Screw on the wall-mount plate on with the plate and M4 screws in the accessory kit.
No link or 10/100 Mbps connection is detected.
Table 2
Description
To enable broadcast storm rate limit.
To disable broadcast storm rate limit.
Not used.
Not used.
Table 3
Figure 1 — Mounting the switch on a DIN-Rail
3

Advertisement

Table of Contents
loading

Table of Contents