Grid-tie with backup II
Load-Battery-Grid:
PV will provide power to the load first. Then,
it will charge the battery. If there is any
remaining power left, it will be fed into the
grid.
Grid-tie with backup III
Load-Grid-Battery:
PV will provide power to the load first. If
there is more PV power available, it will be
fed into the grid. If feed-in power reaches
max. feed-in power setting, the remaining
power will charge the battery.
Grid-tie with backup IV
TOU:
If this mode is selected, it is only allowed to
setup peak and off- peak times for electricity
demand. Programs for 15, 17, 18, 19 and 20
can't be set and only programs for 21, 22, 23
and 24 can be set.
Off-Grid Mode
Load-Battery:
Off-Grid I
PV will provide power to the load first and
then charge battery. PV power cannot be fed
back into the grid under this mode.
Simultaneously, the grid relay is disconnected.
Off-Grid II
Battery-Load:
PV power will charge the battery first. After
the battery is fully charged; the remaining PV
power left, will provide power to the load. PV
power cannot be fed back into the grid under
this mode. Simultaneously, the grid relay is
disconnected.
Off-Grid III
Load-Battery:
The PV power will provide power to the load
first and then charge the battery. PV power
cannot be fed back into the grid under
this mode. Simultaneously, the grid relay is
disconnected.
Grid-Tie Mode
The PV power only feeds into the grid. No
priority setting is available.
present in the
Solar and Utility (default)
PV will support loads firs. If there is any
remaining PV power after supporting the
loads, it will charge the battery. If PV power
is not available, grid will charge the battery.