K-Base - Landis+Gyr FOCUS KWH Technical Manual

Solid-state meter
Table of Contents

Advertisement

4.1.4.

K-Base

1). Compare the wiring with diagrams of Section 3.2 to made sure the meter is wired properly.
2). Install the meter on the studs in the K-mounting device.
3). Tighten down nuts securely to torque requirements listed inside the socket.
4). Check to make sure that the LCD operates and sequences through the display items which were
programmed into the meter.
12
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents