Run service wiring into the
housing
Warning: Ensure that the main power
supply is disconnected at the
distribution panel before running service
wiring into the High Power Connector.
1. Punch out the appropriate knock-out for
the wiring to enter the main housing and
de-burr the edges. You can pass wiring
into the main housing through either the
top or the left side.
2. Route suitable gauge wiring through the
main housing using 1" or larger conduit.
3. Select a suitable sized conduit connector
and fit to the housing.
4. Connect the electrical conduit to the High
Power Connector and tighten the conduit
connector.
5. Pass the wiring into the main housing.
6. Remove any debris that may have
accumulated inside the housing.
Step-by-step installation instructions
7