Installing The Gpu Module; Installing And Removing The Gpu Module; Required Equipment - Cisco UCS X10c Installation And Service Manual

Front mezzanine gpu module
Table of Contents

Advertisement

Installing the GPU Module

This chapter contains the following topics:

Installing and Removing the GPU Module

The front mezzanine module installs into the front mezzanine slot of Cisco UCS X-Series compute nodes.

Required Equipment

Cisco provides a kit (UCSX-X10C-GPUFM) for installing the Cisco UCS X10c front mezzanine GPU module.
The kit contains the following:
• Required GPU cables
• The front mezzanine cage including:
To provide flexibility for your deployment, the U.2 drives and GPUs are orderable separately. However, if
you order the Cisco UCS X10c front mezzanine GPU module with one GPU, the unused GPU slot is
pre-populated with a filler module. You can purchase additional filler modules from Cisco.
Installing and Removing the GPU Module, on page 5
Front Mezzanine GPU Module Configuration, on page 10
Required Equipment, on page 5
Removing the Front Mezzanine GPU Module, on page 6
Installing the Front Mezzanine GPU Module, on page 8
• The storage cage which supports a maximum of two U.2 drives
• The GPU cage which supports a maximum of two Cisco T4 GPUs (UCSX-GPU-T4-MEZZ).
Note
If you order the Cisco UCS X10c front mezzanine GPU module with one GPU,
the unused GPU slot is pre-populated with a filler module. You can purchase
additional filler modules from Cisco
Cisco UCS X10c Front Mezzanine GPU Module Installation and Service Guide
2
C H A P T E R
5

Advertisement

Table of Contents
loading

Table of Contents