Installing The Fli Module - Cisco GS7000 Installation Instructions Manual

Gainmaker node forward local injection module
Table of Contents

Advertisement

3
Local Injection version of the 1x2 Redundant Forward Configuration Module.
4
F-type bulkhead RF connector assembly for port F2 (or optional port F1) on node
housing lid.
5
Two 1.5 dB pads for the FWD I/S pads on the GS7000 Node RF amplifier
assembly.
Note: Pads are not included in upgrade kit. Obtain those from your normal on-
hand node accessories.

Installing the FLI Module

Note: This example uses port F2 for the external RF source. This should represent
the majority of installations, since port F1 is most commonly used as the input port
for the optical fibers.
Important: For complete information on opening/closing the node and working on
components inside the node, refer to Model GS7000 GainMaker Scaleable 4-Port Node
Installation and Operation Guide, part number 4013584.
Complete the following steps to install the FLI Module in the node.
1
Open the node housing.
2
Place the FLI Module in the RCVR 4 position on the OIB in the node housing lid
and insert the module until it is connected to the OIB.
Note: If an existing receiver module is in the RCVR 4 position, it must be moved
to a different RCVR position. Refer to Receiver/Transmitter Module Removal
and Replacement.
3
Tighten the module retaining screws to secure the module in the node. Torque
the screws from 25 to 30 in-lbs (2.8 to 3.4 Nm).
4019330 Rev C
FLI Module Installation
5

Advertisement

Table of Contents
loading

Table of Contents