Advertisement

Quick Links

The Texas Instruments TPS22985EVM evaluation module (EVM) helps designers evaluate the operation
and performance of the TPS22985: Supply Selection IC. The TPS22985 selects a 3.3V input from two
available supplies and connects the chosen input to two outputs, OUTA and OUTB. If a 3.3V supply is not
present, the outputs become high impedance. The TPS22985 has two modes of operation, Normal and
Control.
The EVM contains one TPS22985 - Supply Selection IC (See
CONVERTER
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
2
3
3.1
3.2
1
2
3
4
5
1
2
3
4
SLVU729 - May 2012
Submit Documentation Feedback
Table 1. Device and Package Configurations
U1
..................................................................................................................
................................................................................................................
...............................................................................................
......................................................................................
....................................................................................
...........................................................................................
....................................................................................
...........................................................................................
.....................................................................................
................................................................................................................
...........................................................................................
...........................................................................................................
.....................................................................................................
........................................................................................................
..........................................................................................................
..........................................................................................................
......................................................................................................
................................................................................................
.....................................................................................
.................................................................................................
..............................................................................................
...........................................................................................
Copyright © 2012, Texas Instruments Incorporated
Table
IC
TPS22985YFP
Contents
List of Figures
List of Tables
User's Guide
SLVU729 - May 2012
TPS22985EVM
1).
PACKAGE
YFP
TPS22985EVM
2
2
2
2
3
3
3
3
3
4
8
8
9
4
5
6
7
8
1
2
2
9
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS22985EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPS22985EVM

  • Page 1: Table Of Contents

    SLVU729 – May 2012 TPS22985EVM The Texas Instruments TPS22985EVM evaluation module (EVM) helps designers evaluate the operation and performance of the TPS22985: Supply Selection IC. The TPS22985 selects a 3.3V input from two available supplies and connects the chosen input to two outputs, OUTA and OUTB. If a 3.3V supply is not present, the outputs become high impedance.
  • Page 2: Introduction

    Introduction Setup This section describes the jumpers and connectors on the EVM as well and how to properly connect, set up, and use the TPS22985EVM. Power Supply Inputs Table 2 shows the voltage input that should be applied in different places of the EVM.
  • Page 3: Powering Up In Normal Mode

    RXC and TXH. Measuring the Charge Pump To measure the charge pump output voltage, measure the voltage between TP8 and TP23 with a high impedance meter. SLVU729 – May 2012 TPS22985EVM Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 4: Board Layout

    Board Layout www.ti.com Board Layout Figure 1 through Figure 4 shows the board layout for the TPS22985EVM PCB Figure 1. Top Layer Assembly TPS22985EVM SLVU729 – May 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 5: Top Layer Routing

    Board Layout www.ti.com Figure 2. Top Layer Routing SLVU729 – May 2012 TPS22985EVM Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 6: Top Layer Routing

    Board Layout www.ti.com Figure 3. Top Layer Routing TPS22985EVM SLVU729 – May 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 7: Bottom Layer Routing

    Board Layout www.ti.com Figure 4. Bottom Layer Routing SLVU729 – May 2012 TPS22985EVM Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 8: Schematic And Bill Of Materials

    Schematic and Bill of Materials www.ti.com Schematic and Bill of Materials Schematic Figure 5. TPS22985EVM Schematic TPS22985EVM SLVU729 – May 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 9: Bill Of Materials

    Schematic and Bill of Materials www.ti.com Bill of Materials Table 4. TPS22985EVM Bill of Materials Count RefDes Value Description Size Part Number C1,C2 OPEN Capacitor, Ceramic, C3,C4 0.1uF CAP CER 16V 10% X7R GRM155R71C104KA88D Murata 2.2nF CAP CER 50V 10% X7R...
  • Page 10 Any exceptions to this are strictly prohibited and unauthorized by Texas Instruments unless user has obtained appropriate experimental/development licenses from local regulatory authorities, which is responsibility of user including its acceptable authorization.
  • Page 11 FCC Interference Statement for Class B EVM devices This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications.
  • Page 12 Also, please do not transfer this product, unless you give the same notice above to the transferee. Please note that if you could not follow the instructions above, you will be subject to penalties of Radio Law of Japan. Texas Instruments Japan Limited (address) 24-1, Nishi-Shinjuku 6 chome, Shinjuku-ku, Tokyo, Japan http://www.tij.co.jp...
  • Page 13 FDA Class III or similar classification, then you must specifically notify TI of such intent and enter into a separate Assurance and Indemnity Agreement. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2012, Texas Instruments Incorporated...
  • Page 14 Any exceptions to this are strictly prohibited and unauthorized by Texas Instruments unless user has obtained appropriate experimental/development licenses from local regulatory authorities, which is responsibility of user including its acceptable authorization.
  • Page 15 FCC Interference Statement for Class B EVM devices This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications.
  • Page 16 Also, please do not transfer this product, unless you give the same notice above to the transferee. Please note that if you could not follow the instructions above, you will be subject to penalties of Radio Law of Japan. Texas Instruments Japan Limited (address) 24-1, Nishi-Shinjuku 6 chome, Shinjuku-ku, Tokyo, Japan http://www.tij.co.jp...
  • Page 17 FDA Class III or similar classification, then you must specifically notify TI of such intent and enter into a separate Assurance and Indemnity Agreement. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2012, Texas Instruments Incorporated...
  • Page 18 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.
  • Page 19 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments TPS22985EVM...

Table of Contents