Panel-Mounted Instruments - ABB 4630 Operating Instructions Manual

Ph/redox (orp) analyzers
Table of Contents

Advertisement

...3.2 Mounting
3.2.2 Panel-mounted Instruments – Figs. 3.4 and 3.5
Dimensions in mm (in)
96
(3.78)
Cut a hole in the panel (see Fig. 3.4 for dimensions).
1
Instruments may be close stacked to DIN 43835.
screw on each panel clamp.
anchors from the instrument case.
Refit the panel clamps to the case, ensuring that
5
the panel clamp anchors are located correctly in their slot.
Secure the instrument by tightening the
6
panel clamp retaining screws.
Caution. The clamp must fit flat on the
instrument casing. If the clamp is bowed, the
securing screw is overtight and sealing problems
may occur.
96 (3.78)
12 (0.47)
Fig. 3.4 Overall Dimensions
Loosen the retaining
2
Remove the panel clamp and
Fig. 3.5 Panel Mounting
3 MECHANICAL INSTALLATION
191 (7.52)
3
3
+0.8
+0.03
92
(3.62
)
–0
–0
+0.8
92
–0
Panel Cut-out
+0.03
(3.62
)
–0
Insert the instrument
4
into the panel cut-out.
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

4635

Table of Contents