Scenario D: PV power is not available, and the utility is available.
Input:
(D-1)
PV
Utility
Input:
(D-2)
PV
Utility
Input:
(D-3)
PV
Utility
Input:
(D-4)
PV
Utility
Solar only
Solar only
Solar Priority
Solar Priority
Output:
Inverter Priority
❶
The battery supplies the load alone.
❷
When V
Battery
Output:
Utility Priority
Utility supplies the load.
Output:
Inverter Priority
❶
The battery supplies the load alone.
❷
When V
Battery
not been charged to AOF. Instead, the utility
supplies the load and charges the battery.
❶
Output:
Utility Priority
The utility supplies the load alone.
❷
When V
Battery
not been charged to AOF. Instead, the utility
supplies the load and charges the battery.
30
≤ V
, the utility supplies load.
LVD
≤ V
, Simultaneously, it has
AON
≤ V
, Simultaneously, it has
AON