❸
charged to AOF, the below interfaces show different conditions.
Input:
❷
(C-4)
charged to AOF, the below interfaces show different conditions.
PV
Utility
Input:
(C-5)
PV
Utility
When the battery voltage goes lower than or equal to AON and has not been
Solar Priority
When the battery voltage goes lower than or equal to AON and has not been
Solar and PV
≤ MCC* V
When P
PV
load alone and charges the battery together with
the PV.
When P
> MCC* V
PV
alone and supplies the load together with the
utility.
Output:
Utility Priority
❶
PV charges the battery, and the utility
supplies the load.
≤ MCC* V
When P
PV
load alone and charges the battery together with
the PV.
When P
> MCC* V
PV
alone and supplies the load together with the
utility.
Output:
Un-programmable
❶
When P
≤ MCC* V
PV
load alone and charges the battery together with
the PV.
❷
When P
> MCC* V
PV
battery alone and supplies the load together with
the utility.
29
, the utility supplies the
BAT
, PV charges the battery
BAT
, the utility supplies the
BAT
, the PV charges the battery
BAT
, the utility supplies the
BAT
, the PV charges the
BAT