3.6.5 System Application - Air Handler System
Pressure
Relief Valve
Air Vent
System application drawings are intended to explain the system piping concept only.
Note
Install a NaviClean filter in the system return to remove foreign objects from the system. Foreign
objects inside the system may result in abnormal system operation.
Refer to "3.4 Filling the System" on page 32 for make-up water connections and refer to the
requirements of your local codes to ensure compliance.
Air handlers with an internal pump shall be piped either with a crossover pipe at the AHU or in a
primary/secondary configuration with the boiler.
Refer to the "3.7.9 Wiring Diagram - Air Handler" on page 54 for wiring connections.
You can use a secondary piping configuration for the air handler system to maintain optimal flow
and heat capacity.
Expansion Tank
Air Flow
Air Handler
Air Separator
Make-up Water
preventer
Pressure reducing
Installing the System Piping
Backflow
valve
39

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NFC-250/175H and is the answer not in the manual?

This manual is also suitable for:

Nfc-250/200h

Table of Contents

Save PDF