Installation Of Indoor; Selection Of The Best Location; Ceiling Dimension And Hanging Bolt Location - LG AB-Q24GM1A2 Installation Manual

Table of Contents

Advertisement

INSTALLATION OF INDOOR

Selection of the best location

Install the air conditioner in the location that
satisfies the following conditions.
- The place shall easily bear a load exceeding
four times the indoor unit's weight.
- The place shall be able to inspect the unit as
the figure.
- The place where the unit shall be leveled.
- The place shall easily connect with the out-
door unit.
- The place where the unit is not affected by
an electrical noise.
- The place where air circulation in the room
will be good .
- There should not be any heat source or
steam near the unit
Top view
Unit: mm
Air inlet vents
600
Air outlet vents
Front view
Unit: mm
Confirm the positional relationship between
the unit and suspension bolts.
- Installation the ceiling opening to clean the
filter or service under the product.
Inspection hole
600 x 600
Control box
600
1 000
Front
20 or more
INSTALLATION OF INDOOR
Ceiling dimension and hanging
bolt location
Install the unit above the ceiling correctly.
CASE 1
Position of suspension Bolt
- Apply a joint-canvas between the unit and
duct to absorb unnecessary vibration.
- Apply a filter Accessory at air return hole.
E
Dimension
A B C D E F G H
Capacity(kW)
5 / 7
933.4 971.6 619.2 700 30 270 15.2 858 201.4 900
10
1 283.4 1 321.6 619.2 700 30 270 15.2 1 208 201.4 1 250
13.4 / 15.8
1 283.4 1 321.6 619.2 700 30 360 15.2 1 208 291.4 1 250
7
G
J
A
B
H
Drain hole
(Unit:mm)
I
J

Advertisement

Table of Contents
loading

Table of Contents